The Department of Veterans Affairs (VA) requires a contractor to provide all labor, materials, equipment, and supervision necessary to perform Phase III of the window replacement project at the Birmingham VA Medical Center. The work includes demolition and removal of existing windows and installation of new non-operable windows per construction documents. The contractor shall also provide asbestos and lead abatement for approximately 100 windows, including removal and disposal in compliance with all applicable codes and VA specifications.
Key aspects of the project include:
• Demolition and removal of existing windows
• Installation of new non-operable windows
• Asbestos and lead abatement for approximately 100 windows
• Compliance with VA Design Guides, Infection Control Risk Assessment (ICRA) Level III containment standards, NFPA Life Safety Code, and all applicable building codes
• Phasing plan to minimize disruption to the facility, which will remain operational 24/7 during construction
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.