The Town of Shirley is seeking a qualified engineering consulting firm to examine the project area and design upgrades for existing sidewalks as well as new designs for where there are gaps in the sidewalk network. The project area includes approximately 18,000 feet of Right of Way, including roadways, sidewalks, and intersections connected and adjacent to Shirley's 3A Districts. The selected consultant will be responsible for data collection, conceptual design development, design development, and preparation of final plans, specifications, and estimates. The consultant will also be required to attend monthly meetings with the Steering Committee and provide updates and receive comments.
• The project includes the design of upgrades for existing sidewalks and new designs for areas with gaps in the sidewalk network.
• The project area includes 19 intersections, with the primary intersections along the Right of Way that are included in the scope of work for design improvements.
• The consultant will be required to collect project data, including public input, GIS data, traffic reports, studies, utility surveys, crash data, roadway safety audits, right-of-way plans, traffic counts, field surveys, and base plans.
• The consultant will be required to develop conceptual designs, 25% designs, 75% designs, and 100% designs, with milestones and deadlines for each phase.
• The consultant will be required to attend monthly meetings with the Steering Committee and provide updates and receive comments.