Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›Kingspan Rail Expansion-Phase I Sitework Project

Allegany County·Maryland

Kingspan Rail Expansion-Phase I Sitework Project

Closes 8/3/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Allegany, Maryland is soliciting sealed bids for the Phase I site‑work portion of the Kingspan Rail Expansion. The work consists of clearing and grubbing, grading, rip‑rap, sub‑ballast placement, earthwork, culvert installation, erosion control, and related civil‑engineering tasks required to prepare the rail corridor for track installation. Bidders must purchase the contract documents ($50 per set), attend an optional pre‑bid conference, submit a sealed bid with a 5 % bid bond, and comply with prevailing‑wage and equal‑opportunity requirements. The contract will be awarded to the lowest responsible bidder, with a 120‑day construction schedule and liquidated damages of $500 per day for overruns. • Location: Allegany County, Cumberland, MD (701 Kelly Rd, Suite 407) • Bid opening: 3 Aug 2026 @ 3:00 PM; bids accepted until that time • Pre‑bid conference (optional): 15 Jun 2026 @ 10:00 AM, Room 230 • Required documents: Full set of plans/specs ($50) and bid bond (≥5 % of bid) • Scope: Site preparation, earthwork, drainage, sub‑ballast, concrete work, culverts, erosion control, seed & mulch • Completion time: 120 calendar days after notice to proceed • Awards: Lowest responsible bidder; no withdrawal for 90 days after opening

Attached files

Contact

Krista Sweitzer

[email protected]

(301) 876-9512

Key dates

Opened
6/9/2026
Pre-bid meeting
6/15/2026
Closes
8/3/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238910
Solicitation №
Contract No. ACECD-02-0626

Budget estimate

$2,000,000 – $5,000,000

The solicitation does not disclose a contract value. Based on typical costs for extensive rail‑corridor sitework (clearing, grading, sub‑ballast, drainage, and concrete work) in the Mid‑Atlantic region, a Phase I scope of roughly 20,000 CY of earthwork plus associated utilities often ranges from $2 M to $5 M. The low estimate assumes minimal contingencies and lower unit rates; the high estimate reflects higher material costs, mobilization, and potential subcontractor premiums.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Mississippi

Top match · 69%

Construction of Railroad Rehabilitation Phase 1

Closes 11/2/2026Opened 10/30/2026

Port of Stockton·California

68% match

Pre-Construction Services Long Lead Double Track (LLDT) Rail

Closes 11/10/2026Opened 10/9/2026

Port of Lake Charles·Louisiana

68% match

Industrial Park East Rail Extension & Trans‑Loading Yard

Closes 11/19/2026Opened 10/13/2026

City of Kingsport·Tennessee

67% match

Kingsport Bike Park Phase III

Closes 11/3/2026Opened 10/10/2026

Missouri Department of Transportation·Missouri

65% match

City of De Soto, Construction of a new Amtrak station, sidewalks, station platform, canopy, etc.

Closes 11/20/2026Opened 10/22/2026

City of Charlotte·North Carolina

65% match

Hambright Park and Ride Construction Project

Rolling / TBD closeOpened 5/5/2026

Florida Keys Aqueduct Authority·Florida

65% match

MARATHON HIGHWAY CROSSING IMPROVEMENTS, PHASE I

Closes 11/19/2026Opened 10/14/2026

Port of Long Beach·California

65% match

HD-S3180 Pier B On-Dock Rail Support Facility North Yard Utilities & Pier B St. Widening

Closes 11/17/2026Opened 9/17/2026

City of Keene·New Hampshire

64% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Renovate Train Depot

Closes 12/2/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Renovate Train Depot – Saranac Lake Train Depot (Project 47776)

Closes 12/2/2026Opened 10/20/2026

City of Oakland·California

64% match

TELEVISION & PRODUCTION EQUIPMENT AND ACCESSORIES - 840.86 VIDEO SYSTEMS

Closes 11/19/2026Opened 10/23/2026

Town of Hilton Head Island·South Carolina

64% match

Crossings Park Improvements Phase 2-Skate Park and Pump Track

Closes 12/10/2026Opened 10/26/2026

Pawtucket Municipality·Rhode Island

64% match

Tidewater Landing Phase 1 B Riverwalk East Contract 2 – Early Site Work

Closes 1/14/2027Opened 1/14/2027

Port of Long Beach·California

64% match

HD-S3215 Pier B On-Dock Rail Support Facility Rail Yard Access Improvements

Closes 12/15/2026Opened 10/29/2026

The Ride Solution·Florida

64% match

BUS DEPOT IMPROVEMENT - CONSTRUCTION PHASE

Closes 11/6/2026Opened 8/26/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Renovate Train Depot – Saranac Lake Train Depot (Project #47776)

Closes 12/2/2026Opened 10/20/2026

Port of Stockton·California

64% match

Pre-Construction Services Long Lead Double Track (LLDT) Rail

Closes 11/10/2026Opened 10/9/2026

Virginia Department of Transportation·Virginia

64% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

Quonset Development Corporation·Rhode Island

64% match

RI Fast Ferry Site Work - Construction

Closes 11/17/2026Opened 10/28/2026

Alaska Department of Transportation and Public Facilities·Alaska

63% match

ITB: . 0091022/SFHWY00696; KTN Ferry Terminal Electrical and Mechanical Improvements

Closes 11/19/2026Opened 10/23/2026

Port of Iberia District Board of Commissioners·Louisiana

63% match

East and West Yard Expansion and Site Improvements, Pump Station No. 2 and Drainage Improvements

Closes 11/5/2026Opened 9/25/2026

Southern California Regional Rail Authority·California

63% match

Systemwide Signage and Wayfinding Master Plan

Closes 12/2/2026Opened 10/29/2026

Washington Metropolitan Area Authority (WMATA)·District of Columbia

63% match

ADVANCE NOTICE: Rail Modernization Program

Closes 9/30/2027Opened 7/7/2026

City of Charlotte·North Carolina

63% match

Progressive Design-Build Services for Lee S. Dukes WTP Expansion

Rolling / TBD closeOpened 3/23/2026