Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›2026 Pipeline Continuing Construction Contract

Palm Beach County Water Utilities Department·Florida

2026 Pipeline Continuing Construction Contract

Closes 4/29/2026$10M – $50MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Palm Beach County Water Utilities Department is seeking a contractor for the 2026 Pipeline Continuing Construction Contract. The contract involves furnishing all labor, supervision, materials, equipment, supplies, tools, and manufactured articles required to furnish and install raw water mains, potable water mains, wastewater force mains, reclaimed water mains, and related appurtenances. The contractor will be responsible for providing all necessary materials, equipment, and labor to complete the project, including transportation and temporary services. The contract will be for a period of 36 months, with work authorizations issued on an as-needed basis. The contractor must comply with all applicable federal, state, and local safety regulations, laws, and standards. Key aspects of the job include: • Furnishing and installing water mains and appurtenances • Providing all necessary materials, equipment, and labor • Complying with safety regulations and laws • Coordinating with the owner and other contractors • Maintaining safe working conditions and protecting the public • Ensuring minimal disruption to existing facilities and operations • Providing temporary facilities and services as needed • Cleaning and disposing of excess materials and debris • Restoring the job site to a condition acceptable to the owner

Attached files

Contact

Henry Melendez(Buyer)

[email protected]

(561) 493-6120

Key dates

Opened
4/10/2026
Closes
4/29/2026
Duration
36 months

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
IFB-720-WUD 25-040-5

Budget estimate

$10,000,000 – $50,000,000

The budget for this contract is estimated to be in the range of $10 million to $50 million, based on the scope of work and the duration of the contract. The exact budget will depend on the specific requirements of the project and the bids submitted by contractors. Factors that may influence the budget include the cost of materials, labor, and equipment, as well as any changes to the project scope or timeline.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Redlands·California

Top match · 71%

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Long Beach·California

71% match

On-Call Construction

Closes 11/25/2026Opened 10/21/2026

City of Charlotte·North Carolina

70% match

Fiscal Year 2026 Street Main Extensions Contract 1

Rolling / TBD closeOpened 1/15/2026

Fort Pierce Utilities Authority·Florida

69% match

Continuing Contract for Gas Operations Construction and/or Program Management Services ("Project Management")

Closes 11/5/2026Opened 10/9/2026

Saline County·Kansas

68% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

Fort Pierce Utilities Authority·Florida

68% match

Continuing Contract for Architectural Construction and/or Program Management Services ("Project Management")

Closes 11/9/2026Opened 10/9/2026

Texas City of San Antonio·Texas

68% match

ANNUAL CONTRACT FOR CARBON STEEL PIPE AND ACCESSORIES FOR PUBLIC WORKS DEPARTMENT

Closes 11/13/2026Opened 10/28/2026

Fort Pierce Utilities Authority·Florida

68% match

Continuing Contract for Water & Wastewater Systems Construction and/or Program Management Service ("Project Management")

Closes 11/2/2026Opened 10/6/2026

Austin Energy (City of Austin)·Texas

68% match

2026 IDIQ Chilled Water Construction In The ROW Reissue

Rolling / TBD closeOpened 8/31/2026

City of Charlotte·North Carolina

68% match

Fiscal Year 2026 Street Main Extensions Contract 2

Rolling / TBD closeOpened 1/15/2026

City of Beaumont·California

68% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Oregon State University·Oregon

68% match

RESERVE CONTRACT FOR CONSTRUCTION RELATED SERVICES 2024-2030

Closes 8/31/2030Opened 5/24/2024

City of Charlotte·North Carolina

67% match

Pipe Patching Services

Rolling / TBD closeOpened 6/29/2026

City of American Canyon·California

67% match

2026 Sewer Rehabilitation Project

Closes 4/1/2027Opened 9/17/2026

City of Olive Branch·Mississippi

67% match

2026 Term Contract for Annual Asphalt Patching

Closes 12/7/2026Opened 10/22/2026

City of San Bernardino·California

66% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of West Des Moines·Iowa

66% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Austin·Texas

66% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

City of Minneapolis·Minnesota

66% match

BID-PW-Private Water and Sewer Svc Relocation 2027

Closes 11/3/2026Opened 10/16/2026

City of El Paso·Texas

66% match

Job Order Contracting and Facilities Construction 2027

Closes 11/4/2026Opened 9/22/2026

New York City Department of Environmental Protection·New York

66% match

82626B0065-BEDC - CSO-GC-SFS-OH-CP3 Construction of CSO Facilities for Gowanus Canal

Closes 11/17/2026Opened 10/1/2026

National Aeronautics And Space Administration·Mississippi

65% match

FY26 Wave6 Renewal

Closes 12/1/2026Opened 11/25/2025

Pierce County·Washington

65% match

Pipeline Trail Phase 3 - Architecture and Engineering Services

Closes 11/20/2026Opened 10/30/2026

City of Bellevue·Washington

65% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

65% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026