The Grand Coulee Nathaniel Washington Powerplant is seeking a contractor to modernize the 2000T Gantry Crane. The project includes the removal and replacement of existing hydraulic components, the installation of new electrically operated gantry travel drives, and the upgrade of the crane's control system. The contractor will be responsible for furnishing and installing all necessary equipment and materials, as well as performing load tests and providing operation and maintenance training. The project requires coordination with government personnel and compliance with safety and environmental regulations.
Key aspects of the job include:
• Modernization of the 2000T Gantry Crane
• Removal and replacement of existing hydraulic components
• Installation of new electrically operated gantry travel drives
• Upgrade of the crane's control system
• Furnishing and installation of all necessary equipment and materials
• Load tests and operation and maintenance training
• Coordination with government personnel
• Compliance with safety and environmental regulations
Attached files
Contact
Colby Clifford(Contracting Officer's Representative or similar)
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.