Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›Construction of Pedestrian Crossing

Georgia Columbus Technical College·Georgia

Construction of Pedestrian Crossing

Closes 4/29/2026$100k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Columbus Technical College is seeking a qualified supplier to construct a pedestrian crossing on campus. The location will be at the Columbus Campus located at 1045 Manchester Expressway, Columbus, GA 31904. The project involves the construction of a pedestrian crossing, including sidewalk and driveway work, as well as handicap ramps. A mandatory pre-bid conference and site visit will be held on April 8, 2026, at 10:00 a.m. EST. • The project requires the construction of a pedestrian crossing on campus. • The location of the project is at the Columbus Campus. • A mandatory pre-bid conference and site visit will be held on April 8, 2026. • The project involves the construction of a pedestrian crossing, including sidewalk and driveway work, as well as handicap ramps. • The supplier must be qualified to perform the work. • The project is being issued by the Technical College System of Georgia (TCSG) on behalf of Columbus Technical College (CTC).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Obia Fuller(Buyer Contact)

[email protected]

(404) 679-1619

Key dates

Opened
3/27/2026
Pre-bid meeting
4/8/2026Mandatory
Site visit
4/8/2026Mandatory
Closes
4/29/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237310
Solicitation №
82800-COT0000060

Budget estimate

$100,000 – $500,000

Based on the information provided, it is difficult to estimate the exact budget for this project. However, considering the scope of work, which includes the construction of a pedestrian crossing, sidewalk, and driveway, as well as handicap ramps, the budget could be in the range of $100,000 to $500,000. This estimate is based on the assumption that the project is a relatively small-scale construction project. The actual budget could be higher or lower, depending on the complexity of the project, the materials used, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Division of Highways·North Carolina

Top match · 76%

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

City of Sacramento·California

74% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of Seattle·Washington

69% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Town of Westwood·Massachusetts

68% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

68% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

67% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

BREC·Louisiana

67% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Charlotte·North Carolina

66% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Missouri Department of Transportation·Missouri

66% match

SE District, City of Poplar Bluff, PB Pine Street Crossing project

Closes 11/3/2026Opened 10/6/2026

Connecticut Town of Cheshire·Connecticut

66% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

NYS East Fishkill, Town of·New York

66% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Pasadena·California

66% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

Minnesota Department of Administration·Minnesota

66% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Delaware River Joint Toll Bridge Commission·New Jersey

66% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Richmond Government·Virginia

65% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Charlotte·North Carolina

65% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of San Antonio·Texas

65% match

23-03935 George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

City of Charlotte·North Carolina

65% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026

Maryland Prince George's County The Office of Central Services·Maryland

65% match

SIDEWALK AND PEDESTRIAN BRIDGE SNOW REMOVAL

Closes 2/26/2027Opened 7/17/2026

New York City Department of Transportation·New York

65% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

City of Ontario·California

65% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Maryland State Highway Administration·Maryland

65% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

Virginia Department of Transportation·Virginia

65% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Maryland State Highway Administration·Maryland

64% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Columbia·Missouri

64% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026