The US Air Force is seeking a design-build contractor to install a backup generator system at Mountain Home Air Force Base in Idaho. The project involves designing, constructing, and commissioning a complete and functional backup generator system, including a Cummins Onan generator, automatic transfer switch, and fuel system. The contractor will be responsible for conducting a comprehensive facility electrical load study, developing a design package, and obtaining necessary permits. The project must comply with all applicable federal, state, and local codes and regulations. Key milestones include a kick-off meeting, design submittals, government reviews, and construction. The project is expected to take 280 calendar days to complete.
• The contractor must have experience with design-build projects and backup generator systems.
• The contractor must comply with all applicable codes and regulations, including environmental and safety regulations.
• The contractor must obtain all necessary permits and approvals.
• The contractor must provide a comprehensive design package, including drawings, specifications, and calculations.
• The contractor must conduct a comprehensive facility electrical load study to determine the required capacity of the backup generator system.