Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Construction
  5. ›Embarrass River Diversion Channel Phase 3.2

Minnesota Department of Administration·Minnesota

Embarrass River Diversion Channel Phase 3.2

Closes 5/5/2026$4M – $4.5MInvitation for BidLogin requiredFee to access
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Embarrass River Diversion Channel Phase 3.2 project is a multi‑site civil construction effort in Biwabik, MN. The contract will be awarded to a prime contractor responsible for completing a range of site‑specific works, from erosion control to road paving and structural installations, under a single $4.3 million contract. • Fencing at Sites 1 and 3; bituminous trail paving across four sites. • Erosion and sediment control, grading, and material salvage (common fill, riprap, granular filter). • Installation of culverts, manhole structures, A‑Jacks, articulated concrete mats, and seeding/restoration of disturbed areas. • All work must be performed by a qualified prime contractor with at least three prior $2 M+ construction contracts since 2019 and senior staff with 10+ years of relevant experience. • Mandatory pre‑bid meeting on 23 April 2026; bids submitted online by 5 May 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Staci Stoerzinger(Contact)

[email protected]

(651) 201-2451

Key dates

Opened
4/16/2026
Pre-bid meeting
4/23/2026Mandatory
Closes
5/5/2026
Duration
7 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
Quest Number: 10162081

Budget estimate

$4,000,000 – $4,500,000

The solicitation lists an estimated contract value of $4,287,100. Assuming the prime contractor receives the full amount (typical for construction contracts), the client can expect earnings in the low‑to‑mid‑four‑million‑dollar range. Factors influencing the final budget include the precise scope of work at each site, any change‑order adjustments, and the client’s capacity to meet the mandatory experience and staffing requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 64%

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

Clean River Partners·Minnesota

61% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

Town of Church Point·Louisiana

61% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

West Virginia Department of Environmental Protection·West Virginia

60% match

AML- Simpson Creek Highwall, Tipple and Portals Phase II

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·Missouri

60% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of The Interior·Utah

60% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

Gwinnett County Government·Georgia

60% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Cobb County·Georgia

60% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

Inland Empire Utilities Agency·California

59% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

Washakie County Conservation District·Wyoming

59% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Pulaski County Comptroller’s Office·Arkansas

59% match

RIVER PORT ROAD PHASE II

Rolling / TBD closeOpened 8/23/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, New Orleans Harbor And Various Bar Channels Cutterhead No 4-2025

Closes 3/18/2028Opened 3/18/2026

Santa Clara Valley Water District·California

59% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

City of Columbus Ohio·Ohio

59% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

West Virginia Department of Environmental Protection·West Virginia

58% match

AML- Simpson Creek Highwall, Tipple and Portals Phase II

Closes 11/23/2026Opened 10/30/2026

U.S. Department Of Transportation·Wyoming

58% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/28/2026

Town of Bluffton·South Carolina

58% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

NYS Ontario County·New York

58% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

U.S. Department Of Defense·Louisiana

58% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

Texas Brazos River Authority·Texas

58% match

RFP EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project

Closes 11/10/2026Opened 8/3/2026

California Grants·California

58% match

Proposition 1 Lower Los Angeles River Grants

Rolling / TBD closeOpened 1/27/2025