1. Project Overview
The Owner is soliciting proposals from qualified architectural firms to provide architectural and
integrated engineering services for the rehabilitation and adaptive reuse of an existing
commercial building located at:
80 Beekman Avenue, Sleepy Hollow, NY 10591
The scope includes comprehensive architectural design and coordinated engineering sufficient
to support permitting, pricing, and construction of the project. The selected firm shall serve as
Prime Consultant and shall be responsible for the coordination, completeness, and integration
of all architectural and engineering disciplines, whether MEP design services are delivered
through traditional or design-build pathways.
The Project includes base building work (including an owner-operated space), and anticipated
tenant improvement areas.
1.1 Base Building Scope
The subject project consists of the renovation of an approximately ±10,000 square foot, two-
story existing building.
The property has spent significant time in vacancy, suffering water infiltration and stresses from
repeated heat/cold cycles. The base scope of the rehabilitation will include the total rebuilding
of base infrastructure systems such as HVAC, minor structural remediation, plumbing and
electrical infrastructure, modern life safety systems, and the refactoring of accessibility and
egress pathways.
The second floor of the property, included in the base scope, will be designed as a flexible,
multi-arts community hub. It will contain areas for artist studio spaces, coworking amenities,
and a flexible event venue capable of hosting both private gatherings and public cultural
programming.
1.2 Ground Floor Improvement Scope
Final uses for the ground floor (5000sf) are still being finalized, but may include a small
community movie theater, food & beverage establishment, community arts space, a small retail
footprint, or a combination of those described uses. Architectural and engineering services
shall include design and coordination of improvement work sufficient to support permitting,
coordination, and construction.
2. Scope Intent and Goals
The intent of this RFP is to select a design team capable of delivering a coordinated, code-
compliant design while maintaining strict fee discipline under a Cost-Not-to-Exceed (CNTE)
structure.
The request for the proposal’s goals include:
• Clear definition of scope, responsibility, and deliverables
• Compliance with all applicable building, fire, accessibility, and energy codes, including the
New York Stretch Energy Code
• Sufficient design development to support permitting, pricing, and construction
• Coordination across all disciplines to reduce change orders
• Flexibility to refine programmatic and technical decisions during design without fee
escalation
• Accommodation of design–build delivery where appropriate and permitted by the Authority
Having Jurisdiction (AHJ).
3. Scope of Services
3.1 Architectural Services
Architectural services shall include, at minimum:
• Verification of existing conditions
• Space planning and test fits
• Zoning, building code, and life-safety analysis
• Accessibility compliance
• Life Safety compliance
• Schematic Design
• Design Development
• Retention of and Coordination with all engineering disciplines
• Preparation of architectural drawings suitable for permit submission
• Responses to AHJ plan review comments related to architectural scope
• Construction administration, as defined in the proposal
• The planning, specification, and coordination of all MEP systems, whether through
prescriptive design or design-build
3.2 Energy Code & Sustainability Compliance
The Prime Consultant shall be responsible for coordinating energy code compliance, including:
• Compliance with the 2025 base energy code, and if required by the AHJ, the 2020 NYStretch
Energy Code.
• Selection of the appropriate compliance pathway for NY Forward program beyond 2025 base
energy code (if required by the program).
• Preparation of any required energy models, calculations, and/or documentation as needed
per the selected compliance pathway
• Integration of energy requirements into architectural and MEP design
• Responses to AHJ comments related to energy compliance
All energy code compliance services shall be included within the CNTE fee.
4. Existing Conditions and Assumptions
The project involves an existing building with incomplete documentation of existing conditions.
The design team shall anticipate conditions typical of buildings of similar age, construction,
and deferred maintenance, including potential structural modifications and substantial
replacement or upgrade of building systems.
Reasonable refinements resulting from verified existing conditions shall be included within the
base scope.
5. Program Flexibility
Final programming, tenant layouts, and phasing strategies may evolve during the design
process. The design team shall accommodate reasonable programmatic refinement during
Schematic Design and Design Development without additional compensation, provided the
overall project scope remains consistent with this RFP.
6. Deliverables
The project architect team shall provide:
• Schematic Design and Design Development drawing sets
• Coordinated architectural and engineering design documentation
• Permit submission drawings suitable for AHJ approval
• Energy code compliance documentation
• Digital deliverables (PDF and native file formats)
• Design narratives and system descriptions appropriate for competitive bidding and
construction
7. Fee Structure
–
Cost-Not-to-Exceed
This engagement will be awarded as a Cost-Not-to-Exceed (CNTE) contract.
Requirements:
• A single CNTE fee covering all architectural and engineering services
• CNTE fee to include all subconsultant costs
• No additional compensation for coordination, revisions, or permit responses within the
defined scope
• Reimbursable expenses, if any, must be clearly identified and capped
Fee Allocation Requirement
Proposals shall include a single Cost-Not-to-Exceed fee covering all services, with a separate,
clearly identified fee allocation for:
1. Base Building and owner-operated architectural and engineering services; and
2. Ground Floor architectural and engineering services, including coordination and permitting.
The total Cost-Not-to-Exceed fee shall be the sum of the Base Building and Ground Floor
Improvement allocations.Assumptions and Exclusions:
All assumptions and exclusions must be explicitly stated. Any services not expressly excluded
shall be deemed included in the CNTE fee.
8. Optional or Additional Services
Optional or additional services may be proposed as separately priced alternates, including but
not limited to:
• Expanded construction administration
• Design-build contractor coordination
• Phased or early-release packages
• Value engineering or cost estimating
• Grant or agency coordination beyond standard permitting
9. Selection Criteria
Proposals will be evaluated based on:
• Relevant project experience
• Appropriateness and completeness of proposed scope
• Realism, transparency, and competitiveness of CNTE fee
• Coordination strategy across disciplines
• Schedule feasibility
Lowest fee alone will not be the sole determining factor.
10. MWBE Participation Requirements
This project is supported by funding from the New York Forward Program, which includes a
Minority- and Women-Owned Business Enterprise (MWBE) participation goal of thirty percent
(30%) of applicable project costs, in accordance with New York State requirements.
The selected Contractor will be required to cooperate with the Owner’s efforts to achieve
MWBE participation goals and to make good-faith efforts to solicit and utilize New York State–
certified MWBE firms where feasible.
MWBE participation may be achieved through utilization of certified MWBE subcontractors,
suppliers, or other eligible participation consistent with program guidelines and the requirement
that MWBE firms perform a commercially useful function.
Proposers are encouraged to identify opportunities for participation by NYS-certified MWBE
firms within their subcontracting and supply chains, including materials suppliers and other
eligible goods and services.
11. Owner’s Rights
The Owner reserves the right to:
• Reject any or all proposals
• Request clarifications or revisions
• Negotiate scope and fee prior to award
• Award the contract in the best interest of the project
12. Schedule
Anticipated Project Schedule (Non-Binding)
The following schedule is provided for planning purposes only and is intended to inform
proposer staffing and availability. Final schedule will be refined in coordination with the
selected firm.
• RFP Issued: April 13, 2026
• Questions Due: April 20, 2026 (5:00 PM EST)
• Responses to Questions Issued: April 22, 2026
• Proposals Due: April 29 (5:00 PM EST)
• Interviews (if required): Week of May 4, 2026
• Selection / Notice to Proceed: May 11, 2026
Anticipated Design Schedule (Post-Award):
• Schematic Design: 6-8 weeks, beginning Late June, 2026
• Design Development: 8-10 weeks following Schematic Design
• Permit Submission: Following completion of Design Development
• Construction Start (Anticipated): Late 2026
Proposers shall identify any schedule assumptions, constraints, or conflicts in their submission.
13. Proposal Submission Requirements
Proposals shall include:
• Firm profile and relevant experience
• Description of proposed approach and understanding of the project
• Identification of key personnel
• List of engineering subconsultants
• CNTE fee with breakdown by phase
• Schedule assumptions
• Explicit list of assumptions and exclusions
• Proof of insurance
14. Submission Instructions
Proposals shall be submitted electronically to:
Louis Gruber
[email protected]
610-554-8665
Minority / Women Business Enterprise contracting goals (MWBE)
Total MWBE Goals: 30.00%