Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›FCC Yazoo City - Hot Water Pumps Replacement

U.S. Department Of Justice·Mississippi

FCC Yazoo City - Hot Water Pumps Replacement

Closes 6/22/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Federal Correctional Complex (FCC) Yazoo City is soliciting a contract for the replacement of two hot water pumps at the Low I Powerhouse. The contractor will provide all labor, materials, and equipment required to remove the existing pumps and install new base-mounted, double-suction split-case centrifugal pumps. The new pumps must meet specific performance targets, including a design flow of 700 GPM at 152 feet of total dynamic head, operating at 1780 RPM. The contractor must also provide a minimum of seven years of documented experience with systems of similar complexity and adhere to all regulations and guidelines prescribed by the Federal Bureau of Prisons. Key aspects of the project include: • Pre-installation phase to field-verify existing conditions and report discrepancies • Removal and disposal of existing pumps, isolation valves, and expansion joints • Installation of new pumps, motors, and accessories • Final laser alignment and lubrication after grouting • Startup and commissioning process via a factory-authorized representative • System balancing, cleaning, and vibration testing • Delivery of comprehensive O&M manuals, warranty documentation, and laser alignment reports

Attached files

Contact

Carlos Tate(Primary contact)

[email protected]

(662) 716-1020

Key dates

Opened
6/9/2026
Pre-bid meeting
6/16/2026
Site visit
6/16/2026
Closes
6/22/2026
Duration
250 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
333414
Solicitation №
26Z3AP2

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and industry standards. The replacement of two hot water pumps, including labor, materials, and equipment, may cost between $200,000 and $500,000. This estimate takes into account the complexity of the project, the need for specialized equipment, and the requirement for experienced contractors. Factors that may influence the likely payment range include the cost of materials, labor rates, and the need for additional work or repairs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Nevada Adjutant General·Nevada

Top match · 70%

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·New York

69% match

Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT

Closes 11/11/2026Opened 10/29/2026

NYS Oswego County·New York

69% match

E-911 Heat Pump and Roof Top Unit (RTU) Replacement

Closes 11/17/2026Opened 10/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

69% match

Q2078 HVAC – Remove Kitchen Water Heater & Replace Various Pumps

Closes 11/18/2026Opened 10/13/2026

City of Dayton, Ohio·Ohio

69% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

City of Yuba City·California

69% match

City Gauche Aquatic Park (GAP) Pool Heater Replacement Project

Closes 11/10/2026Opened 10/28/2026

City of Toledo·Ohio

69% match

Safety Building HVAC Pumps and VFD Replacement

Closes 11/10/2026Opened 10/23/2026

University of Massachusetts System·Massachusetts

68% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

City of Holly Grove·Arkansas

68% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

U.S. Department Of Veterans Affairs·Missouri

68% match

657-27-107JC, Replace Select Hot Water Heating System

Closes 11/3/2026Opened 9/28/2026

U.S. Department Of Justice·Indiana

68% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

City of Fort Myers·Florida

67% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Defense·North Carolina

67% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

Omaha Public Schools·Nebraska

67% match

Heat Pump Maintenance Services

Closes 11/24/2026Opened 10/26/2026

NYS OGS Design & Construction - Construction Contractors·New York

67% match

Q2078 ELECTRICAL – Remove Kitchen Water Heater & Replace Various Pumps

Closes 11/18/2026Opened 10/13/2026

City of Bedford, TX·Texas

67% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Branson·Missouri

67% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of Chicago·Illinois

67% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

University of Massachusetts Lowell·Massachusetts

67% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of The Interior·Oklahoma

67% match

OK-DEEP FORK NWR-QUARTERS HVAC REPLACEM

Closes 11/11/2026Opened 10/29/2026

Illinois SOS - Secretary of State·Illinois

67% match

Fire Pump System for Stratton Building in Springfield

Closes 11/12/2026Opened 10/19/2026

University of Missouri-Kansas City·Missouri

66% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

City of Visalia·California

66% match

RFB 25-26-64 Replacement of Two (2) HVAC Units at Visalia Water Reclamation Facility

Closes 11/5/2026Opened 10/2/2026

U.S. Department Of Agriculture·Minnesota

66% match

Superior NF Water Heater replacement

Closes 11/4/2026Opened 10/28/2026

City of Camden·South Carolina

66% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026