The Federal Correctional Complex (FCC) Yazoo City is soliciting a contract for the replacement of two hot water pumps at the Low I Powerhouse. The contractor will provide all labor, materials, and equipment required to remove the existing pumps and install new base-mounted, double-suction split-case centrifugal pumps. The new pumps must meet specific performance targets, including a design flow of 700 GPM at 152 feet of total dynamic head, operating at 1780 RPM. The contractor must also provide a minimum of seven years of documented experience with systems of similar complexity and adhere to all regulations and guidelines prescribed by the Federal Bureau of Prisons.
Key aspects of the project include:
• Pre-installation phase to field-verify existing conditions and report discrepancies
• Removal and disposal of existing pumps, isolation valves, and expansion joints
• Installation of new pumps, motors, and accessories
• Final laser alignment and lubrication after grouting
• Startup and commissioning process via a factory-authorized representative
• System balancing, cleaning, and vibration testing
• Delivery of comprehensive O&M manuals, warranty documentation, and laser alignment reports