Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Zero Emissions Initiatives Phase 1

Ontario International Airport·California

Zero Emissions Initiatives Phase 1

Closes 6/1/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the installation of 17 new electric vehicle charging stations to support Electric Ground Support Equipment (eGSE) operations at Ontario International Airport. The work will be performed at Terminal 2 and Terminal 4 apron areas, as well as within existing and new electrical rooms located throughout both terminal buildings. The successful vendor will be responsible for providing construction services necessary to install eGSE charging equipment and infrastructure, including power servers, power stations, charging cables, and cable management systems. Some key features of the project include: • Installation of eGSE charging equipment and infrastructure • Electrical power distribution, including panelboards, circuit breakers, feeders, branch circuits, disconnect switches, and associated conduits and wiring • Installation of equipment pads, protective bollards, pavement marking and striping for designated charging equipment areas and associated site work • Coordination with civil and airport operational requirements for equipment locations and routing of underground conduits • Verification of existing electrical system capacity and integration with existing electrical infrastructure • Provision of grounding, bonding, surge protection, and safety devices in accordance with applicable codes and manufacturer requirements • Startup, commissioning, and functional testing of the charging equipment • Preparation of as-built documentation and operation manuals for the installed system

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jacqueline Meraz(Procurement Specialist II)

[email protected]

(909) 519-0411

Key dates

Opened
5/1/2026
Questions due
5/18/2026
Pre-bid meeting
5/7/2026
Site visit
5/7/2026
Closes
6/1/2026
Duration
1 year

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
2026-IFB-081

Budget estimate

$1,000,000 – $5,000,000

Based on the scope of work, which includes the installation of 17 electric vehicle charging stations, electrical power distribution, and associated site work, the estimated budget for this project could be in the range of $1 million to $5 million. This estimate is rough and based on industry standards for similar projects. The actual budget will depend on various factors, including the complexity of the work, the location, and the contractor's experience and qualifications.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Los Angeles Harbor Department·California

Top match · 61%

Zero-Emission Truck Purchasing Incentive Project

Closes 12/3/2026Opened 6/29/2026

South Coast Air Quality Management District·California

60% match

Year 2026 WAIRE Mitigation Program

Closes 12/15/2026Opened 10/13/2026

U.S. Golden Field Office·United States of America

60% match

Notice of Intent to Issue NOFO DE-FOA-0003649: Leveraging Domestic Infrastructure and Resources to Unleash Alternative Chemicals, Fuels and Feedstocks

Closes 4/26/2027Opened 10/13/2026

U.S. Environmental Protection Agency·Ohio

60% match

A--SBIR FY26 Phase I Broad Agency Announcement

Closes 11/8/2026Opened 9/25/2026

South Coast Air Quality Management District·California

60% match

Hydrogen-Based Zero-Emission On-Road Mobile Source Related Technology Development, Demonstration, Deployment, Workforce Development, and Air Quality Impact Projects

Closes 11/13/2026Opened 10/2/2026

Power Authority of New York·New York

60% match

Supporting Clean Energy for Community Impact Request for Applications (RFA)

Rolling / TBD closeOpened 10/16/2026

U.S. Golden Field Office·United States of America

60% match

Accelerating Scale-up and Pre-piloting of Emerging Chemical Technologies (ASPECT)

Closes 12/1/2026Opened 9/4/2026

South Coast Air Quality Management District·California

60% match

Zero Air Generator

Closes 11/4/2026Opened 10/2/2026

South Coast Air Quality Management District·California

60% match

Cargo Handling Equipment, Locomotives, Ships at Berth Emissions Capture and Control Systems, and Transport Refrigeration Units Proposition 1B - Goods Movement Emission Reduction Program

Closes 11/20/2026Opened 9/8/2026

New York State Energy Research and Development Authority·New York

59% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 11/14/2025

U.S. Department Of Defense·Minnesota

59% match

Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands

Closes 11/11/2026Opened 10/29/2026

U.S. Environmental Protection Agency·United States of America

59% match

A--SBIR FY26 Phase I Broad Agency Announcement

Closes 11/8/2026Opened 10/13/2026

South Coast Air Quality Management District·California

59% match

2020 Volkswagen Environmental Mitigation Trust Zero-Emission Class 8 Freight And Port Drayage Trucks Statewide Program Announcement

Rolling / TBD closeOpened 8/18/2020

U.S. Environmental Protection Agency·United States of America

58% match

2026 Diesel Emissions Reduction Act (DERA) National Program

Closes 1/22/2027Opened 9/24/2026

New York State Energy Research and Development Authority·New York

58% match

Catalyze Clean Energy Financing for Decarbonization in NY State Communities

Closes 12/30/2026Opened 9/30/2024

NYSERDA·New York

58% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 5/29/2026

Massachusetts Executive Office of Housing & Livable Communities·Massachusetts

58% match

HLC0000130 COMMERCIAL CONVERSION TAX CREDIT INITIATIVE (CCTCI) Notice of Funding Availability (NOFA)

Closes 11/13/2026Opened 8/18/2026

Massachusetts Department of Energy Resources·Massachusetts

58% match

DOER PON-ENE-2027-010 Municipal Decarbonization Planning Assistance Program Opportunity Notice

Closes 8/3/2029Opened 10/19/2026

California Energy Commission·California

58% match

GFO-26-502 – Integrated Point-Source Carbon Capture and Advanced Combustion at Industrial Facilities

Closes 1/19/2027Opened 9/23/2026

Massachusetts Northern Middlesex Council of Governments·Massachusetts

58% match

Northern Middlesex Brownfields Assessment Program Qualified Environmental Professional Services

Closes 11/20/2026Opened 10/23/2026

U.S. National Institutes of Health·United States of America

58% match

NIH Research Program Projects (Parent P01 Clinical Trial Optional)

Closes 5/25/2029Opened 2/11/2026

New York State Energy Research and Development Authority·New York

58% match

Commercialization Cohort Programs

Closes 12/2/2026Opened 10/14/2026

U.S. National Institutes of Health·United States of America

57% match

Early-Onset Cancers: Investigating Etiology, Mechanisms, and Early Detection Strategies (RP1 Clinical Trials Optional)

Closes 10/11/2029Opened 3/10/2026

Town of Eatonville·Florida

57% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

New York State Energy Research and Development Authority·New York

57% match

Window Heat Pump Demonstration Program - Phase II

Closes 6/30/2027Opened 11/14/2025