Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Gavins Point Raw Water Intake Zebra Mussel Mitigation

U.S. Department Of Defense·Nebraska

Gavins Point Raw Water Intake Zebra Mussel Mitigation

Closes 9/4/2026$250k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Army Corps of Engineers is seeking a contractor to design and install a zebra mussel mitigation system at the Gavins Point Raw Water Intake. The system will include two local tank skids with spill containment, two pump skids, and interfacing with existing raw water flow meters. The contractor will be required to commence work upon receipt of contract award and complete the work within 210 days after receipt of Notice to Proceed. • The project includes installation of two local tank skids and integral spill containment pallets • Installation of two pump skids for distribution • Power supply to distribution pumps and ancillary distribution system equipment • Interfacing of distribution pumps with the existing raw water flow meters The estimated construction cost of the project is between $250,000 and $500,000.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brianna Wohlers

[email protected]

(402) 995-2668

Key dates

Opened
7/10/2026
Closes
9/4/2026
Duration
210 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
W9128F26QA074

Budget estimate

$250,000 – $500,000

The estimated construction cost of the project is between $250,000 and $500,000. This estimate is based on the project description and the scope of work, which includes design and installation of a zebra mussel mitigation system. The actual budget may vary depending on the contractor's bid and the final scope of work. Factors that may influence the likely payment range include the complexity of the design, the cost of materials and labor, and any changes to the scope of work during the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Power Authority of New York·New York

Top match · 68%

ZEBRA MUSSEL CONTROL SERVICES

Closes 11/23/2026Opened 10/30/2026

U.S. Department Of Defense·Florida

63% match

Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·Massachusetts

63% match

Individual Water Treatment Device (IWTD) for Reduction/Removal of Toxic Industrial Chemicals and Materials

Closes 11/12/2026Opened 10/8/2026

U.S. DOC NOAA - ERA Production·United States of America

63% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

Environmental Conservation, NYS Department of·New York

63% match

Vegetative Surveys of Saratoga Sandplains Wildlife Management Area

Closes 11/18/2026Opened 10/21/2026

U.S. Fish and Wildlife Service·United States of America

62% match

F26AS00083 Aquatic Invasive Species Grants to Great Lakes States - Fiscal Year 2026 Great Lakes Restoration Initiative

Closes 12/31/2026Opened 6/10/2026

U.S. Fish and Wildlife Service·United States of America

62% match

F26AS00084 Aquatic Invasive Species Grants to Great Lakes Tribes - Fiscal Year 2026 Great Lakes Restoration Initiative

Closes 12/31/2026Opened 5/7/2026

Santa Clara Valley Water District·California

62% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

Illinois Natural Resources·Illinois

62% match

Invasive Carp removal and monitoring in the Upper Mississippi River (CAFWS-181)

Rolling / TBD closeOpened 1/1/2026

Illinois Natural Resources·Illinois

62% match

Invasive Carp Management Control in IL Waterway GLRI (CAFWS-183)

Rolling / TBD closeOpened 1/1/2026

Renewable Water Resources·South Carolina

61% match

Lime Slurry Supply at Water Resource Recovery Facilities (WRRFs) and Pump Stations RFP 607

Closes 12/4/2026Opened 10/15/2026

California Grants·California

61% match

Wildlife Corridor and Fish Passage

Rolling / TBD closeOpened 6/18/2025

Illinois Natural Resources·Illinois

61% match

Invasive Carp Management Control in IL Waterway GLRI (FY26)

Rolling / TBD closeOpened 12/21/2025

West Virginia Division of Natural Resources – Wildlife Resources Section·West Virginia

61% match

WRS: Open-End Contract for Formaldehyde

Closes 11/17/2026Opened 10/30/2026

El Dorado Irrigation District·California

61% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

California Grants·California

61% match

Nature Based Solutions – Wildlife Corridors

Rolling / TBD closeOpened 6/16/2025

California Grants·California

61% match

Drinking Water State Revolving Fund (DWSRF) Planning

Rolling / TBD closeOpened 8/1/2022

Illinois Natural Resources·Illinois

61% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

West Virginia Division of Natural Resources – Wildlife Resources Section·West Virginia

61% match

WRS: Open-End Contract for Trout Food

Closes 11/17/2026Opened 10/28/2026

City of El Paso·Texas

61% match

Frozen Feeder Fish

Closes 11/6/2026Opened 10/16/2026

California Grants·California

60% match

Proposition 68 Fish and Wildlife Improvement Grant Program

Rolling / TBD closeOpened 4/8/2025

Alaska Department of Environmental Conservation·Alaska

60% match

Ketchikan Lakes Alternative Raw Water Supply Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/11/2026

California Grants·California

60% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

St. Louis County, MN - Purchasing Division·Minnesota

60% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

U.S. Fish and Wildlife Service·United States of America

60% match

F26AS00085 Aquatic Invasive Species Interjurisdictional Grants to the Great Lakes States and Tribes - Fiscal Year 2026 Great Lakes Restoration Initiative

Closes 12/31/2026Opened 5/20/2026