This solicitation calls for the complete installation of two Level 2 electric‑vehicle (EV) charging stations at the Pennsylvania Lumber Museum in State Park Region 1, including all necessary electrical upgrades, civil site work, and finish‑out items. The contractor will be responsible for design‑build delivery of power feeder circuits, trenching, conduit installation, concrete footings, pavement reconstruction, signage, testing, commissioning, on‑site training, and delivery of operation & maintenance manuals. All work must comply with the 2017 NEC, Pennsylvania Uniform Construction Code, and DCNR General Conditions, and must be completed within 150 calendar days after notice to proceed.
• Provide two new 208 V feeder circuits from the existing main distribution panel to the EV stations.
• Perform trenching, install PVC conduit, concrete footings, and construct two EV‑designated parking spaces with appropriate markings and barriers.
• Supply, install, test, and commission ClipperCreek Level 2 charging stations (including pedestal kits) and furnish training, warranties, as‑built drawings, and O&M manuals.
• Secure all required permits, coordinate L&I inspections, and meet the project’s 150‑day performance schedule.