Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Construction
  5. ›Install EV Charging Stations – State Park Region 1 – PA…

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

Install EV Charging Stations – State Park Region 1 – PA Lumber Museum

Closes 6/11/2026$75k – $150kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for the complete installation of two Level 2 electric‑vehicle (EV) charging stations at the Pennsylvania Lumber Museum in State Park Region 1, including all necessary electrical upgrades, civil site work, and finish‑out items. The contractor will be responsible for design‑build delivery of power feeder circuits, trenching, conduit installation, concrete footings, pavement reconstruction, signage, testing, commissioning, on‑site training, and delivery of operation & maintenance manuals. All work must comply with the 2017 NEC, Pennsylvania Uniform Construction Code, and DCNR General Conditions, and must be completed within 150 calendar days after notice to proceed. • Provide two new 208 V feeder circuits from the existing main distribution panel to the EV stations. • Perform trenching, install PVC conduit, concrete footings, and construct two EV‑designated parking spaces with appropriate markings and barriers. • Supply, install, test, and commission ClipperCreek Level 2 charging stations (including pedestal kits) and furnish training, warranties, as‑built drawings, and O&M manuals. • Secure all required permits, coordinate L&I inspections, and meet the project’s 150‑day performance schedule.

Attached files

Contact

Josh Roth(Site Administrator)

[email protected]

(814) 435-2652

Key dates

Opened
5/13/2026
Questions due
6/1/2026
Closes
6/11/2026
Projected award
6/12/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
FDC-100-11334.4R

Budget estimate

$75,000 – $150,000

The solicitation’s engineer’s estimate ranges from $25 k to $100 k. Considering the additional costs for civil site work, concrete footings, pavement restoration, permit fees, testing equipment, training, and the contractor’s overhead and profit, a realistic award value likely falls between $75 k and $150 k. The lower end reflects a minimal‑scope bid focused on electrical work only, while the higher end assumes full civil‑construction scope and higher material costs for the EV stations and parking improvements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Tamarac·Florida

Top match · 74%

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

Pennsylvania Philadelphia Regional Port Authority·Pennsylvania

69% match

RFP for EV Forklifts and Charging Stations

Closes 11/17/2026Opened 10/22/2026

County of Sonoma·California

69% match

RFQ On-Call Electric Vehicle Charging Station

Closes 11/6/2026Opened 9/24/2026

Connecticut Energy & Environmental Protection·Connecticut

69% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

Department of Education·South Carolina

68% match

Electric Bus Charging Stations - Colleton - Paving

Closes 11/10/2026Opened 10/19/2026

City of Pinole·California

68% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

Wyoming Department of Transportation·Wyoming

68% match

NATIONAL ELECTRIC VEHICLE INFASTRUCTURE PROGRAM

Closes 11/18/2026Opened 9/23/2026

California Department of Parks and Recreation·California

67% match

C26915007 WILL ROGERS STATE HISTORIC PARK - Interim Power

Closes 11/17/2026Opened 10/19/2026

City of Cincinnati·Ohio

67% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/16/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

67% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

67% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Maryland Department Of General Services·Maryland

66% match

Installing 10 Single-Port 48A Level 2 and 2 Level 3 80 kW DC Fast Chargers at Maryland Correctional Transportation Unit

Closes 11/9/2026Opened 10/17/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

66% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Cincinnati·Ohio

66% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/19/2026

Michigan Lansing School District·Michigan

66% match

SO-1862 Electrical Infrastructure/install chargers/bess

Closes 11/12/2026Opened 10/19/2026

Massachusetts Department of Transportation·Massachusetts

66% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

New York State Energy Research and Development Authority·New York

66% match

Charge Ready NY 2.0

Closes 12/31/2026Opened 7/8/2025

SC Department of Education·South Carolina

66% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

New York City Department of Transportation·New York

66% match

Request for Information (RFI) Regarding Electric Vehicle Charging Incentive Program

Closes 11/30/2026Opened 9/14/2026

County of Hawaii·Hawaii

66% match

MASS TRANSIT FACILITY IMPROVEMENTS

Closes 11/5/2026Opened 9/28/2026

Virginia Port Authority·Virginia

65% match

RFP 2027-10-VPA Battery Electric Locomotive Charging Solution

Closes 11/17/2026Opened 10/13/2026

Department of Conservation and Recreation·Virginia

65% match

Underground Fuel Storage Tank Maintenance, Leesylvania State Park - Repost

Closes 11/2/2026Opened 10/22/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

65% match

60 Gasoline Golf Carts for Green Lakes State Park Golf Course

Closes 11/13/2026Opened 9/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026