Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›26-11 Professional Utility System Design Plan Review…

Bay County, FL·Florida

26-11 Professional Utility System Design Plan Review Consulting Services

Closes 2/17/2026$100k – $2.5MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bay County Board of County Commissioners is seeking qualifications from firms to review water and wastewater utility plan documents for new development infrastructure. The selected firm will be responsible for ensuring compliance with Bay County Utility Services standards and specifications, as well as State and Federal rules and requirements. The scope of services includes reviewing plan drawings and data, ensuring compliance, checking for potential conflicts with existing infrastructure, verifying regulatory compliance, and providing expertise in areas of water and wastewater utility design. The firm must be a State of Florida licensed professional, and architects and engineers must hold a Florida Professional Architect or Engineer's license. • Review plan drawings and data for proposed water and wastewater utility infrastructure • Ensure compliance with Bay County Utility Services standards and specifications • Check for potential conflicts with existing infrastructure • Verify regulatory compliance • Provide expertise in areas of water and wastewater utility design

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Mike Allen(Purchasing Department)

[email protected]

(850) 730-4705

Key dates

Opened
1/13/2026
Questions due
2/9/2026
Closes
2/17/2026
Projected award
4/21/2026

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
RFQ 26-11

Budget estimate

$100,000 – $2,500,000

The budget for this opportunity is likely to be a professional services contract with a value dependent on the scope of work and the firm's expertise. Based on the requirements, the contract value could range from $100,000 to $500,000 per year, depending on the number of projects and the level of service required. The contract may be renewed annually, and the total contract value over the life of the contract could be $500,000 to $2,500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Seattle·Washington

Top match · 71%

CITYWIDE CONSULTANT ROSTER: Public Utility Related Consulting

Closes 12/30/2030Opened 8/29/2025

Valley Sanitary District·California

71% match

Strategic Plan Update Consulting Services

Closes 11/6/2026Opened 10/15/2026

South Tahoe Public Utility District·California

70% match

Engineering Services for Water System and Sewer Collection System Strategic Plans

Closes 12/11/2026Opened 10/27/2026

City of Farmington·New Mexico

69% match

Cost of Service and Rate Study

Closes 12/8/2026Opened 10/26/2026

East Bay Municipal Utility District·California

69% match

RFP - Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services

Closes 11/11/2026Opened 10/1/2026

City of Pinole·California

69% match

Multidisciplinary On Call Professional Services: Plan Check, Engineering, Environmental, and Office & Field Support

Closes 11/30/2026Opened 10/14/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

69% match

Full Document: Request for Proposals. Sewer Utility Superintendent & Engineering Consultant 2026-2027

Closes 11/13/2026Opened 10/29/2026

City of Nixa·Missouri

69% match

Professional Electrical Engineering Services

Closes 11/17/2026Opened 10/14/2026

Maryland Mayor and Town Council of Oakland·Maryland

69% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

City of Cape Coral, FL·Florida

69% match

Professional Engineering & Design Services for the North 6 and Future Utilities Extension Project (UEP) Areas

Closes 11/9/2026Opened 9/28/2026

City of Burlingame·California

69% match

Professional Services for Streetlight Master Plan

Closes 11/19/2026Opened 10/13/2026

Maryland City of Havre de Grace·Maryland

68% match

Building Plan Review and Inspection Professional Services

Closes 11/23/2026Opened 10/22/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

68% match

Request for Proposals: Sewer Utility Superintendent & Engineering Consultant 2026-202. For the full document, click on the header below

Closes 11/13/2026Opened 10/29/2026

City of Atlanta·United States of America

68% match

RFP/DWM/2609-1270055/Architectural, Engineering, Design and Construction

Closes 11/23/2026Opened 10/23/2026

City of Nixa·Missouri

68% match

Professional Civil Engineering Services

Closes 11/17/2026Opened 10/14/2026

City of Columbia·Missouri

68% match

Electric Cost of Service and Rate Study

Closes 11/9/2026Opened 10/12/2026

City of Alhambra·California

68% match

PROFFESIONAL ENGINEERIGN DESIGN SERVICES (PS&E) FOR FY26/27 RMRA STREETS REHABILITATION PROJ

Closes 11/19/2026Opened 9/21/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

68% match

CIP 2537 Design Services for Installation of Alljoy Phase 2 Low-Pressure Sewer System

Closes 8/4/2027Opened 7/6/2026

Louisiana Jefferson Parish·Louisiana

67% match

SOQ from qualified Professional Consulting Firms interested in

Closes 11/16/2026Opened 10/14/2026

City of Hartford·Connecticut

67% match

On Call Electric Vehicle (EV) Consultant Services

Closes 11/19/2026Opened 10/26/2026

Cape May County Municipal Utilities Authority·New Jersey

67% match

Contract RFP-32-26 Professional Engineering Services - 2027 General Consulting Services For The Cape

Closes 11/19/2026Opened 10/20/2026

San Bernardino County·California

67% match

RFP - Professional Engineering Services for CSA 70 BL Septic-to-Sewer Expansion Project

Closes 11/17/2026Opened 10/6/2026

City of Columbus·Ohio

67% match

Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

Fort Pierce Utilities Authority·Florida

67% match

Water & Wastewater Systems Continuing Professional Engineering and/or Design Services

Closes 11/2/2026Opened 10/6/2026

McHenry County·Illinois

67% match

2026-2027 DIVISION OF TRANSPORTATION FACILITY OPTIMIZATION, UTILIZATION, AND NEEDS REVIEW & RELATED CAPITAL PLAN

Closes 11/16/2026Opened 10/21/2026