Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Moku:PRO Multi-instrument hardware package

U.S. Department Of Commerce·Maryland

Moku:PRO Multi-instrument hardware package

Closes 7/27/2026$50k – $200kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Institute of Standards and Technology (NIST) is seeking information from sources that may be capable of providing a Moku:PRO Multi-instrument hardware package, which includes a Moku:PRO base unit, lock-in amplifier module, PID controller module, and ISO/IEC 17025 accredited calibration. The package should meet all technical specifications identified by NIST. • The system must include a Moku:PRO base unit, lock-in amplifier module, PID controller module, and ISO/IEC 17025 accredited calibration. • The contractor shall provide a system that meets all technical specifications identified by NIST. • NIST conducted market research and found that only Liquid Instruments appears to be capable of meeting NIST's requirements. • Respondents should provide information about their company's capabilities, experience, and qualifications to provide the required products or services.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Elizabeth Timberlake

[email protected]

Key dates

Opened
7/13/2026
Questions due
7/17/2026
Closes
7/27/2026

Last updated

Details

Type
Sole Source
Industry
Manufacturing
NAICS
334515
Solicitation №
NIST-SS26-CHIPS-151

Budget estimate

$50,000 – $200,000

The budget for this opportunity is difficult to estimate, as the document does not provide a specific budget or price range. However, considering the technical specifications of the Moku:PRO Multi-instrument hardware package and the fact that it is a sole source award, the budget could potentially be in the range of $50,000 to $200,000. This estimate is based on the assumption that the package is a specialized instrument with high-tech components, and the price may vary depending on the manufacturer, model, and other factors.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Western Kentucky University·Kentucky

Top match · 65%

WKU-10442 Audio Visual Classroom Technology, Control Systems, and Integrators

Closes 1/7/2027Opened 10/29/2026

New York City Police Department·New York

64% match

05627Y0268-Rigaku XRD Instrument

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Energy·Ohio

63% match

TECHNOLOGY LICENSING OPPORTUNITY: Multi-Channel Atomic Magnetometer (MCAM)

Closes 12/12/2026Opened 7/17/2026

U.S. Department Of Defense·United States of America

62% match

ROBMC Interpreter Equipment

Closes 11/6/2026Opened 10/23/2026

U.S. Department Of Health And Human Services·Maryland

62% match

Combines Synopsis Solicitation- Automated Spatial

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

C5ISR Center MOSA Management Office (MMO) for CMOSS / VICTORY / MORA

Closes 3/23/2027Opened 7/14/2022

Georgia Clayton County Board of Education·Georgia

61% match

IFB 002-27 Musical Equipment, Labs, and Sound Systems

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

61% match

CONT,MULTI-LOOP PRO

Closes 11/12/2026Opened 10/22/2026

Texas BakerRipley·Texas

61% match

Multifunction Devices and Lease Services

Closes 12/30/2026Opened 9/29/2026

U.S. Department Of Defense·Oklahoma

61% match

Multi-Award Multi-Platform OTA

Closes 11/14/2026Opened 10/15/2026

Mesquite ISD·Texas

61% match

Software, Online Subscriptions, Hardware, Services and Communication Services

Closes 5/31/2031Opened 6/4/2026

U.S. Department Of Defense·Florida

61% match

V-22 AIRCRAFT SOFTWARE CONCURRENCY UPGRADES AND FLIGHT TRAINING DEVICE INTEGRATION

Closes 11/5/2026Opened 9/30/2026

U.S. Department Of Defense·Maryland

61% match

Notification of Availability of Software Framework, Warped Alloy, for Software Defined Radio (SDR) Signal Chain

Closes 12/1/2026Opened 1/12/2026

U.S. Department Of Defense·Virginia

61% match

Hand Held Terminals / SOTI Software Requirement

Closes 11/9/2026Opened 10/29/2026

Oregon Health and Science University·Oregon

61% match

Multi-Vendor Service

Rolling / TBD closeOpened 1/1/2017

National Aeronautics And Space Administration·Alabama

61% match

ComposiCAD Gold 4 axes

Closes 11/4/2026Opened 10/30/2026

NYS Roswell Park Cancer Institute Corp.·New York

60% match

Multi Function Device Support Services

Closes 11/6/2026Opened 10/16/2026

U.S. Department Of Energy·Illinois

60% match

Leica Absolute Tracker ATS800 and Accessories

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Energy·New York

60% match

Oxford PlasmaLab 100 tool PLC upgrade or its Equivalent

Closes 11/6/2026Opened 10/21/2026

Piedmont Technical College·South Carolina

60% match

SS-19002: Mitutoyo Metrology Equipment

Rolling / TBD closeOpened 9/24/2019

U.S. Department Of Defense·Florida

60% match

V-22 AIRCRAFT SOFTWARE CONCURRENCY UPGRADES AND FLIGHT TRAINING DEVICE INTEGRATION

Closes 11/5/2026Opened 9/30/2026

U.S. Department Of Energy·Idaho

60% match

Open Source Software: MOOSE: The Multiphysics Simulation Powerhouse

Closes 3/15/2028Opened 3/15/2024