The City of Port Orange is soliciting bids for the construction of a new discharge structure, piping, and berm for the Cambridge pump station. The project includes the installation of approximately 475 feet of 54-inch DIP storm main by jack and bore under the FEC Railway and 455 feet of 72-inch PCCP storm main by open cut. The successful bidder will be required to provide a bid guarantee in the form of a bid bond executed by the Bidder and an acceptable surety or a certified check or bank draft payable to the City of Port Orange.
Key aspects of the project include:
• Construction of a new discharge structure, piping, and berm
• Installation of 475 feet of 54-inch DIP storm main by jack and bore under the FEC Railway
• Installation of 455 feet of 72-inch PCCP storm main by open cut
• Sod replacement, driveway, roadway, and right-of-way repair
• Concrete, asphalt, dirt, and gravel replacement in kind at all disturbed areas
The City of Port Orange reserves the right to reject any and/or all bids when such rejection is in the best interest of the City.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.