Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Construction
  5. ›Water Control Structure Replacement; TWRA

State of Tennessee·Tennessee

Water Control Structure Replacement; TWRA

Closes 8/31/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Tennessee Wildlife Resources Agency is seeking a qualified contractor to replace a water‑control structure at White Lake Refuge in Dyer County, TN. The scope includes full mobilization, site preparation, excavation, earth‑fill/embankment, temporary water‑control measures, removal of existing structures, installation of new concrete weirs, drainage pipes, and associated steel work, plus placement of aggregate base and implementation of erosion and pollution control measures. The contract is a single‑award, lowest‑cost bid with delivery required by early September 2026. • Mobilize personnel, equipment, and materials to the White Lake Refuge site. • Perform earthwork, construct embankments, and install new concrete and steel water‑control structures. • Provide aggregate base, geotextile fabric, and comprehensive erosion‑ and pollution‑control measures. • Deliver completed work by 5 Sep 2026, complying with all Tennessee procurement, insurance, and certification requirements.

Attached files

Contact

William Harmon III(Solicitation Coordinator)

[email protected]

(615) 741-3285

Key dates

Opened
8/13/2026
Questions due
8/21/2026
Site visit
8/19/2026Mandatory
Closes
8/31/2026
Duration
1 month

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
32801-13977

Budget estimate

$500,000 – $1,500,000

No budget is disclosed, but similar small‑scale water‑control structure replacements (including excavation, concrete, steel fabrication, and environmental mitigation) typically range from several hundred thousand dollars to just over one million dollars depending on site conditions, material quantities, and labor rates. Assuming moderate earthwork, a concrete weir, steel components, and full environmental controls, a plausible estimate is between $500,000 and $1,500,000. Factors influencing the range include soil conditions, the extent of existing infrastructure removal, material prices, and contractor overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New York City Department of Environmental Protection·New York

Top match · 66%

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Chicago·Illinois

66% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Holly Grove·Arkansas

65% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

Washington Suburban Sanitary Commission, MD·Maryland

65% match

Water Engineering Services (BOA)

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·Mississippi

65% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

West Basin Municipal Water·California

65% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

Nevada Adjutant General·Nevada

65% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Washington

64% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

64% match

Mihalik Thompson Stadium DHW Replacement

Closes 11/19/2026Opened 10/21/2026

Santa Clara Valley Transportation Authority·California

64% match

Guadalupe Light Rail Vehicle Wash Improvements

Closes 11/13/2026Opened 9/16/2026

Contra Costa Water District·California

64% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

New York City Department of Environmental Protection·New York

64% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Douglas WY·Wyoming

64% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

City of Holly Grove·Arkansas

64% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

Village of Wellington·Florida

64% match

Water Reclamation Facility Solids Control Room Relocation Project.

Closes 11/12/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

64% match

ACTUATOR,HYDRAULIC-

Closes 11/23/2026Opened 10/22/2026

Western Virginia Water Authority·Virginia

64% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Chennault International Airport Authority·Louisiana

64% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026