Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›Hot Water Pump Piping – Waupaca Regional Center

Fox Valley Technical College·Wisconsin

Hot Water Pump Piping – Waupaca Regional Center

Closes 9/1/2026$150k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Fox Valley Technical College is seeking a sealed‑bid contractor to install an additional hot‑water pump and perform repiping at its Waupaca Regional Center. The work will be awarded to a single contractor and includes a full set of specifications, drawings, and construction standard documents. The bid must be submitted electronically by the deadline, and a mandatory pre‑bid conference will be held via Microsoft Teams. • Scope: Install one hot‑water pump and repipe the associated system for the Waupaca Regional Center. • Delivery: One‑time installation; all materials, labor, testing, and commissioning included. • Requirements: Sealed electronic bid, bid bond required, mandatory pre‑bid conference (August 21 2026). • Documents: Full IFB package, construction spec standards, and detailed drawings are available for download. • Location: Waupaca Regional Center, Fox Valley Technical College, Appleton, WI.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Becky Ward(Analyst - Procurement and Contracts)

[email protected]

Key dates

Opened
8/7/2026
Pre-bid meeting
8/21/2026Mandatory
Closes
9/1/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
IFB-27003-0-2026/BJW

Budget estimate

$150,000 – $300,000

No explicit budget is listed, but installing a new hot‑water pump and repiping a regional center typically ranges from $150,000 to $300,000 depending on equipment size, pipe length, and site conditions. The estimate assumes a mid‑size pump, moderate pipe runs, and standard labor rates for the Appleton, WI region.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Hawaii Community Development Authority·Hawaii

Top match · 69%

Honuakaha Hot Water Return Systems Modifications

Closes 11/20/2026Opened 10/26/2026

Connecticut UConn Health Center·Connecticut

68% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

Santa Maria-Bonita School District·California

67% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

City of Dayton, Ohio·Ohio

67% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

New York State Energy Research and Development Authority·New York

67% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 11/14/2025

New York State Energy Research and Development Authority·New York

67% match

Window Heat Pump Demonstration Program - Phase II

Closes 6/30/2027Opened 11/14/2025

City of Piqua·Ohio

67% match

CITY OF PIQUA OHIO - Drake Road Water Booster Pumping Station - Project #24-17.3

Closes 11/19/2026Opened 10/11/2026

City of Stillwater·Oklahoma

67% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

University of Massachusetts System·Massachusetts

67% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Delaware

67% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

66% match

Water Pumps

Closes 11/6/2026Opened 10/23/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

66% match

Mihalik Thompson Stadium DHW Replacement

Closes 11/19/2026Opened 10/21/2026

Omaha Public Schools·Nebraska

66% match

Heat Pump Maintenance Services

Closes 11/24/2026Opened 10/26/2026

University of Massachusetts Lowell·Massachusetts

66% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

NYS Oswego County·New York

66% match

E-911 Heat Pump and Roof Top Unit (RTU) Replacement

Closes 11/17/2026Opened 10/30/2026

City of Columbus·Ohio

66% match

PAWP Wellfield Development

Closes 11/4/2026Opened 10/5/2026

City of DeLand·Florida

66% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

Q2078 HVAC – Remove Kitchen Water Heater & Replace Various Pumps

Closes 11/18/2026Opened 10/13/2026

City of Waconia·Minnesota

66% match

Waconia, City of – Reitz Lake Area Lift Station – 25X.138802

Closes 11/24/2026Opened 10/29/2026

NYSERDA·New York

66% match

Clean Heat for All: Packaged Terminal Heat Pump Program - Phase II

Closes 6/30/2027Opened 10/10/2025

Hillsborough County Public Schools·Florida

66% match

HVAC Water Treatment

Closes 11/30/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

Replace Heating HW Lines, Building 144, Admin, 145 Visitor Waiting & 146 Visitor – HVAC Work

Closes 11/18/2026Opened 9/30/2026

Jackson County Utility Authority·Mississippi

66% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

City of Waukegan·Illinois

66% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

U.S. Department Of Defense·North Carolina

65% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026