Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Dredging Improvements For Green Oaks Boulevard Pond

City of Arlington·Texas

Dredging Improvements For Green Oaks Boulevard Pond

Closes 4/14/2026$2M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Arlington is soliciting bids for the dredging of approximately 11,145 cubic yards of sediment from the Green Oaks Boulevard Pond. The project will involve hydraulic dredging and mechanical dewatering. The contractor will be required to submit a bid that includes all necessary documentation, including a certified or cashier's check or an approved bidder's bond. The City reserves the right to reject any or all bids. The project is expected to start approximately two months after the bid opening date. Key aspects of the project include: • Dredging of approximately 11,145 cubic yards of sediment from the Green Oaks Boulevard Pond • Hydraulic dredging method • Mechanical dewatering method • Requirement for Pollution Liability insurance • Requirement for a Performance Bond and a Payment Bond • Requirement for a Maintenance Bond for two years after project completion • Compliance with Texas Government Code Chapter 552 • Compliance with Title VI of the Civil Rights Act of 1964 • Requirement for an Aquatic Resources Relocation Plan • Requirement for relocation and protection of freshwater mussels species • Requirement for a pre-bid meeting/teleconference

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Evodio Martinez(Project Manager)

[email protected]

(817) 459-5435

Key dates

Opened
3/22/2026
Pre-bid meeting
3/30/2026
Closes
4/14/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
PWDR22003 Addendum 1

Budget estimate

$2,000,000 – $3,000,000

Based on the Engineer's estimate, the budget for this project is expected to be around $2,266,000. The actual budget may vary depending on the bid price and any potential change orders. Factors that may influence the budget include the cost of labor, materials, and equipment, as well as any unforeseen site conditions or changes to the project scope.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Tulsa County·Oklahoma

Top match · 72%

Dredging at LaFortune Park Golf Course

Closes 11/2/2026Opened 9/21/2026

Virginia Polytechnic Institute and State University·Virginia

72% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

City of Charlotte·North Carolina

71% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Virginia Polytechnic Institute and State University·Virginia

70% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of North Charleston·South Carolina

70% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

Cleveland Metroparks·Ohio

69% match

Cleveland Metroparks Marina Dredging Years 2027-2031, Parkwide

Closes 11/3/2026Opened 10/1/2026

City of Valdosta·Georgia

69% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

U.S. Department Of Defense·Louisiana

69% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/22/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)

Closes 7/16/2027Opened 7/16/2025

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

69% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

68% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/3/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

City of North Charleston·South Carolina

68% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

U.S. Department Of Defense·Louisiana

68% match

Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,

Closes 2/5/2027Opened 12/11/2024

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

City of Plano·Texas

68% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

City of Plano·Texas

67% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

U.S. Department Of Defense·Louisiana

67% match

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026