Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Civil Engineering
  5. ›Middle Yellow River Interceptor Phase 2

Gwinnett County·Georgia

Middle Yellow River Interceptor Phase 2

Closes 1/20/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

* Project involves construction of approximately 6,000 feet of 24-inch diameter DIP gravity sewer * Installation of 19 precast concrete manholes and abandonment of private septic systems * Connection to existing sewer, polyethylene wrap, and multiple stream crossings * Installation of sewer service connections, erosion and sediment control measures, and site restoration * Preparation of as-built drawings and provision of GIS data for new piping and manholes * Project must be substantially complete within 420 days and fully complete within 450 days * Mandatory pre-qualification of prospective bidders is required * Bids must be submitted by 2:50 P.M. on January 15, 2026, and the bid opening will be virtual

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
11/15/2025
Closes
1/20/2026

Last updated

Details

Industry
Civil Engineering
NAICS
237930

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Santa Clara Valley Water District·California

Top match · 60%

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

Cobb County·Georgia

60% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

Town of Church Point·Louisiana

60% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

Clean River Partners·Minnesota

60% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

59% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 2-2026 (OM26002)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Missouri

59% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

City of Gainesville - Procurement Division·Florida

59% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

City of Lynchburg·Virginia

59% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Austin·Texas

59% match

Gilleland Wastewater Interceptor

Rolling / TBD closeOpened 8/17/2026

Georgia Cobb County Department of Transportation·Georgia

59% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Oregon Clackamas County·Oregon

59% match

RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build

Closes 12/3/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Missouri

59% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Pulaski County Comptroller’s Office·Arkansas

59% match

RIVER PORT ROAD PHASE II

Rolling / TBD closeOpened 8/23/2026

Town of Eatonville·Florida

59% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·South Dakota

59% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

U.S. Department Of Defense·Louisiana

58% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)

Closes 3/23/2027Opened 3/26/2025

NYS Ontario County·New York

58% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026