Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Civil Engineering
  5. ›MGSU, J-469-DP Cochran Campus Domestic Water System…

Board of Regents of the University System of Georgia·Georgia

MGSU, J-469-DP Cochran Campus Domestic Water System Replacement

Closes 8/25/2026$4M – $5MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Board of Regents of the University System of Georgia is seeking a design professional services firm to provide comprehensive planning and design services for the proposed Cochran Campus Domestic Water System Replacement project at Middle Georgia State University. The project involves replacing the existing domestic water distribution system, which has reached the end of its useful service life, with a modern system that provides reliable and efficient service to the campus. The selected firm will be responsible for providing all design services, including the development of plans and specifications, and will work closely with the university and other stakeholders to ensure that the project meets the needs of the campus community. Some key aspects of the project include: • Replacing aging water mains and service lines with modern materials • Installing new valves and fire hydrants • Improving system looping and increasing redundancy • Enhancing pressure and flow throughout the campus distribution system • Providing a comprehensive long-term solution to the university's water system needs • Incorporating sustainable design and construction concepts into the project • Ensuring that the project is completed on time and within budget

Attached files

Contact

Brian Harrell(Executive Director)

[email protected]

Key dates

Opened
8/4/2026
Questions due
8/18/2026
Pre-bid meeting
9/8/2026Mandatory
Site visit
9/8/2026Mandatory
Closes
8/25/2026
Duration
12 months

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541310
Solicitation №
PE-47200-RFQ-2026-000000147

Budget estimate

$4,000,000 – $5,000,000

The estimated construction cost for the project is $4,150,000, and the design professional fee is estimated to be approximately $340,000. Based on these estimates, the total budget for the project could be around $4,490,000. However, this amount may vary depending on various factors, such as changes in the project scope, unforeseen site conditions, and fluctuations in material costs. The budget for the design professional services firm will depend on their fee proposal, which will be evaluated based on factors such as their experience, qualifications, and proposed design plan. The firm's fee will be negotiated with the owner, and the final budget will depend on the terms and conditions of the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

University of Massachusetts System·Massachusetts

Top match · 74%

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

72% match

Mihalik Thompson Stadium DHW Replacement

Closes 11/19/2026Opened 10/21/2026

University of Massachusetts Lowell·Massachusetts

71% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Missouri

70% match

657-27-107JC, Replace Select Hot Water Heating System

Closes 11/3/2026Opened 9/28/2026

U.S. Department Of Health And Human Services·Arizona

70% match

SRSU - Water System Installation and Upgrade

Closes 2/17/2029Opened 2/10/2026

Horry Georgetown Technical College·South Carolina

69% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

North Carolina Southwestern Community College·North Carolina

69% match

Founders Building Hot Water system rennovation

Closes 11/12/2026Opened 10/21/2026

U.S. Department Of Defense·U.S. Armed Forces – Pacific

69% match

PMP for Water Facilities Circulation Systems

Closes 1/9/2027Opened 12/2/2025

State of Michigan Department of Technology, Management and Budget·Michigan

69% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/16/2026

Goodwyn Mills Cawood·Georgia

68% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

North Dakota State University·North Dakota

68% match

NDSU - ASTM Type I and Type III Pure Water System Replacement

Closes 11/17/2026Opened 10/20/2026

The Ohio State University·Ohio

67% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

State of Michigan·Michigan

67% match

171/23125.CTS; Jerome Hart Building - Chilled Water Upgrades

Closes 11/11/2026Opened 10/23/2026

San Jacinto College·Texas

67% match

SJC Quote 27-006 Reverse Water System Services

Closes 11/3/2026Opened 10/15/2026

San Jacinto College·Texas

67% match

SJC Quote 27-006 Reverse Water System Services

Closes 11/6/2026Opened 10/15/2026

The Metropolitan Water District of Southern California·California

67% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

U.S. Department Of Defense·Oregon

67% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

City of Bellevue·Washington

67% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Nevada Adjutant General·Nevada

67% match

OTAG Water Heater Replacement

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Washington

67% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

City of Charlotte·North Carolina

67% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

The University of Iowa·Iowa

67% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

Georgia City of Cartersville·Georgia

67% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Troy, OH·Ohio

67% match

Miami Shores Golf Course Irrigation System Renovation Project

Closes 11/4/2026Opened 10/14/2026

State of Michigan Department of Technology, Management and Budget – State Facilities Administration, Design and Construction Division·Michigan

67% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/29/2026