Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Engineering Services
  5. ›AC Chiller Repair and Maintenance Services SFB

Saint Louis Lambert International Airport·Missouri

AC Chiller Repair and Maintenance Services SFB

Closes 7/7/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of St. Louis Airport Authority is seeking a qualified contractor to provide comprehensive repair, preventive‑maintenance, and emergency services for a fleet of industrial‑scale air‑conditioning chillers and associated control systems at St. Louis Lambert International Airport. The contract spans three years, beginning November 1 2026, and requires monthly inspections, quarterly refrigerant‑leak checks, seasonal start‑up/shut‑down procedures, annual chemical analysis, tube and heat‑exchanger cleaning, and 24 × 7 emergency response. All consumables, lubricants, and refrigerants are to be supplied by the contractor (with a permitted 15 % markup on parts). The contractor must hold EPA Section 608 certification, obtain airport security badges for all personnel, comply with Missouri Living‑Wage and Unauthorized Aliens statutes, and provide extensive documentation after each service event. Key points: • Monthly and seasonal chiller inspection, service, and repair of 9 chillers across East/West Power Plants and Airport Office Building. • Annual mechanical cleaning of two plate‑heat exchangers (ITT Bell & Gossett and Alfa Laval) with documentation due within four weeks. • 24‑hour emergency response with a 2‑hour response window, EPA 608 certification, and full compliance with living‑wage, anti‑discrimination, and security badge requirements.

Attached files

Contact

Gin Nelson(Contract Compliance Officer)

[email protected]

(314) 890-8033

Key dates

Opened
5/13/2026
Questions due
6/5/2026
Pre-bid meeting
6/2/2026
Closes
7/7/2026
Projected award
11/1/2026
Duration
3 years

Last updated

Details

Type
Invitation for Bid
Industry
Engineering Services
NAICS
238220

Budget estimate

$500,000 – $1,500,000

The contract requires a full‑service maintenance team, parts inventory, refrigerant handling, and 24 × 7 emergency coverage for nine large chillers over three years. Assuming an average monthly labor invoice of $12,000–$25,000 (including markup on parts) plus occasional emergency callouts, total revenue could range from roughly $500,000 to $1.5 million across the contract term. Factors influencing the final amount include the number of emergency incidents, actual part‑replacement costs, and the contractor’s markup strategy (up to 15 %).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Sacramento·California

Top match · 78%

Chiller Overhaul Maintenance Services

Closes 11/4/2026Opened 10/19/2026

California Department of General Services·California

77% match

25-320917.FMD.ChillerMaintenance&Repair

Closes 11/17/2026Opened 10/6/2026

South Carolina Natural Resources·South Carolina

77% match

INSPECT & PREVENTATIVE MAINT ON CHILLERS

Closes 11/10/2026Opened 10/13/2026

Socorro ISD·Texas

75% match

Refrigeration and Air Conditioning Maintenance and Repair

Closes 11/6/2026Opened 10/23/2026

Department of Natural Resources·South Carolina

75% match

IFB Annual Inspection & Preventative Maint on Chillers

Closes 11/10/2026Opened 10/13/2026

LA County Internal Services Department·California

75% match

937043 REPAIR CORROSION ON CHILLER END BELLS

Closes 11/6/2026Opened 10/16/2026

DOC - Division of Institutions·Virginia

74% match

DOCA-756-27-06R - SF CHILLERS, EQUIPMENT PREVENTATIVE MAINTENANCE

Closes 11/10/2026Opened 10/28/2026

West Virginia Office of Shared Administration (OSA) Purchasing Division·West Virginia

74% match

CHILLER AND VENTILATION MAINTENANCE

Closes 11/17/2026Opened 10/28/2026

California Department of Veterans Affairs·California

74% match

26FS0006 - Chiller Maintenance Services

Closes 11/3/2026Opened 10/20/2026

Eastern Kentucky University·Kentucky

73% match

Trade Service Agreement - Chiller Maintenance

Closes 11/6/2026Opened 10/19/2026

North Carolina City of Charlotte·North Carolina

73% match

CATS Boiler and Chiller Maintenance and Repair Services

Closes 11/12/2026Opened 9/22/2026

California Department of State Hospitals·California

73% match

27-30502-000

Closes 12/10/2026Opened 10/26/2026

Los Angeles County·California

72% match

RFQ-IS-27260217 - 937043 REPAIR CORROSION ON CHILLER END BELLS - Closing: 11/6/2026 12:00 PM

Closes 11/6/2026Opened 10/17/2026

Department of Corrections·South Carolina

72% match

WME CHILLER Drive Repair

Closes 7/31/2027Opened 7/24/2026

University of South Carolina·South Carolina

72% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

California Department of Forestry and Fire Protection·California

71% match

4CA07760 Heating, Ventilation, and Air Conditioning (HVAC) Equipment Maintenance and Repair Services

Closes 11/4/2026Opened 9/9/2026

Department of Corrections·South Carolina

71% match

Security and Maintenance Upgrades - HVAC, Chiller and Kitchen Boiler Replacement - Headquarters - Replace Air Handlers

Closes 11/17/2026Opened 10/14/2026

Kentucky Cabinet for Health and Family Services·Kentucky

71% match

RFB-100-27 CHFS OAK Repair Building 501 Chiller

Closes 11/10/2026Opened 10/13/2026

Alabama United States Air Force·Alabama

71% match

McQuay Chiller Repair for 187th FW BLDG 1501

Closes 11/16/2026Opened 10/29/2026

Massachusetts Reading Municipal Light Department·Massachusetts

70% match

IFB 2026-34 - HVAC and Ice Machine Preventative Maintenance and Repair Service

Closes 11/4/2026Opened 10/14/2026

University of Massachusetts·Massachusetts

70% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

U.S. Department Of Veterans Affairs·North Carolina

70% match

RENTAL OF TWO CHILLERS FOR ONE YEAR

Closes 11/10/2026Opened 10/20/2026

City of West Palm Beach·Florida

70% match

Ice Machine, Preventative Maintenance and Repair Services

Closes 11/12/2026Opened 10/23/2026

City of West Palm Beach·Florida

70% match

Ice Machine, Preventative Maintenance and Repair Services

Closes 11/12/2026Opened 10/22/2026

City of Columbus·Ohio

69% match

HVAC Repair, Replacement and Maintenance Services UTC

Closes 11/19/2026Opened 10/15/2026