The Western Area Power Administration is seeking a contractor to provide various materials for the T Line rebuild in Montana. The materials include shackles, deadends, dampers, and other equipment. The contractor must provide the materials to be delivered to Ft. Peck, MT, FOB Destination. The requirement is 100% small business set-aside. The contractor must include adequate descriptive literature with their quote for WAPA to review the product. The country of manufacturer and delivery lead time must also be provided.
* The materials to be provided include:
* Shackles, forged anchor, ultimate strength 60,000# 3/4"
* Deadend, compression, 954 MCM 54/7 ACSR, vertical
* Damper, vibration, Stockbridge, Alcoa #1705-11BA, ACSR, over armor rod, 397.5
* Y-Ball, clevis, w/bolt, nut and humpbacked cotter key - P/N Hubbell #YBC30 or Maclean ycb-65a
* Bolt, with nut and cotter key galvanized 5/8 x 4", Hughes B64D-1-1/2
* Clips, bonding Hughes #2727.8