Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Water and Wastewater
  5. ›2025 Washington RWD 2 Water System Improvements

Washington County Rural Water District No. 2·Kansas

2025 Washington RWD 2 Water System Improvements

Closes 8/4/2026$2.2M – $4.1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks a single‑prime contractor to construct approximately 27,060 linear feet of 4‑inch PVC Class 200 water line, including tracer wire, eight 4‑inch gate valves, one flush hydrant, and associated appurtenances for Washington County Rural Water District No. 2. • Scope: Install new water transmission line (~27 k LF) with tracer wire, valves, hydrant, and miscellaneous fittings. • Delivery: Lump‑sum and unit‑price bid based on provided bid form; all plans and specs available for purchase. • Requirements: Bidders must submit sealed bids by 2:00 PM CST, Aug 4 2026; provide bid security, comply with KDHE State Revolving Loan Fund regulations, and meet anti‑lobbying certifications for contracts > $100 K.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Keithen Meyer

[email protected]

Key dates

Opened
7/2/2026
Closes
8/4/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
25.1.0050

Budget estimate

$2,200,000 – $4,100,000

The contract involves installing 27,060 ft of 4″ PVC pipe with valves, hydrant and ancillary work. Assuming an average installed cost of $80‑$150 per foot (materials, excavation, backfill, testing), total project cost would range roughly $2.2 M to $4.1 M. Therefore the contractor’s revenue (before overhead and profit) is estimated in that bracket. Factors influencing the range include site conditions, trench depth, local labor rates, and the extent of ancillary appurtenances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

St. Helena Parish Police Jury·Louisiana

Top match · 70%

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

70% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Alexandria·Louisiana

69% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

U.S. Department Of Veterans Affairs·Washington

69% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

City of Conway·South Carolina

69% match

Highway 905 Water Line Upgrade

Closes 12/3/2026Opened 10/30/2026

City of San Diego·California

68% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

Mississippi

68% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

Kansas Department of Wildlife and Parks·Kansas

67% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

Riverton City·Utah

67% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

U.S. Department Of Health And Human Services·Arizona

66% match

SRSU - Water System Installation and Upgrade

Closes 2/17/2029Opened 2/10/2026

City of Fredonia·Kansas

66% match

Distribution System Improvements - Fredonia, KS

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·Oregon

66% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

City of Holly Grove·Arkansas

66% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of Wilmington·Delaware

66% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

Metropolitan Council·Minnesota

66% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

66% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Riverton City·Utah

66% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Washington Suburban Sanitary Commission, MD·Maryland

66% match

Water Engineering Services (BOA)

Closes 11/18/2026Opened 10/14/2026

City of Conway·South Carolina

66% match

HWY 905 Water Line Upgrade - RFP

Closes 12/3/2026Opened 10/30/2026

Chennault International Airport Authority·Louisiana

66% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026

The City of Columbus·Ohio

66% match

RFQ033855 - Hoover Dam Improvements Pt. 2

Closes 12/9/2026Opened 10/16/2026

City of Vancouver·British Columbia

66% match

Consultant Services - Hydraulic Water Model Update

Closes 11/25/2026Opened 10/28/2026

City of Bellevue·Washington

66% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Litchfield·Illinois

66% match

Water Distribution Improvements Phases 1 & 2 - Litchfield, IL

Closes 11/5/2026Opened 10/2/2026

County of Frederick, MD·Maryland

66% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026