This Sources Sought notice requests information from firms capable of performing heavy civil‑engineering construction to protect the Mary Rhodes Pump Station’s streambank. The scope includes rebuilding a 2,015‑ft riverbank, installing toe riprap, and placing tie‑backs approximately every 250 ft to a depth of 50 ft, with a steep 2H:1V slope and a total height of about 44 ft. The project aims to halt erosion, extend the pump station’s service life, and maintain hydraulic performance, all under USACE safety and environmental standards.
• Rebuild and slope bank, install longitudinal toe riprap and tie‑backs along ~2,015 ft of riverbank.
• Require compliance with EM 385‑1‑1 safety manual and all applicable federal, state, and local regulations.
• Small‑business set‑aside encouraged; firms must be registered in SAM.gov and submit three recent comparable project references.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.