Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Loeb Well No. 3 Rehabilitation and Pump Replacement

City of Beaumont·Texas

Loeb Well No. 3 Rehabilitation and Pump Replacement

Closes 9/3/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Beaumont is seeking qualified contractors to rehabilitate and replace the pump system at Loeb Well No. 3. The scope includes mobilization, well video inspection, temporary water conveyance, chlorination, performance testing, supply and installation of a new discharge head, column assembly, and one of three possible pump configurations (2,500 gpm, 3,000 gpm, or 3,500 gpm). Additional optional work such as acid treatment, brush cleaning, and screen repair is listed as extra items. Bidders must attend a mandatory pre‑bid conference on 26 August 2026 and submit all required forms, bonds, and certifications by 3 September 2026. • Mobilize equipment, rig, and personnel to the well site • Perform video inspection, bail oil, and proper disposal • Install temporary steel tanks and leak‑proof discharge piping • Chlorinate well screens and restore site condition • Conduct well, pump, motor, and vibration performance testing (four rates) • Supply and install a steel fabricated discharge head with motor register • Install column assembly, oil tube, bearings, airline, and level monitoring system • Provide one of three pump packages (2,500 gpm, 3,000 gpm, 3,500 gpm) with full electrical wiring • Transport and reinstall existing well motor and oil‑pot assembly • Perform start‑up, purging, and final site restoration • Optional acid treatment, brush cleaning, screen/casing repair, and follow‑up video inspection (extra‑price items)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brent Schmitt

[email protected]

(409) 730-4409

Key dates

Opened
8/13/2026
Questions due
8/28/2026
Pre-bid meeting
8/26/2026Mandatory
Closes
9/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
WU1126-09 Addendum 1

Budget estimate

$200,000 – $500,000

Based on similar municipal well‑rehabilitation contracts, the total bid amount typically ranges from $200,000 to $500,000. The lower end reflects a basic pump replacement with minimal extra work, while the higher end includes the larger 3,500 gpm pump option, optional acid treatment, and full site restoration. Factors influencing the final budget include the selected pump size, any extra optional services chosen, and local labor/material cost variations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut City of Meriden·Connecticut

Top match · 69%

Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

City of Albany·Georgia

69% match

Well No. 21 Rehabilitation

Closes 11/16/2026Opened 10/12/2026

Georgia City of Albany·Georgia

69% match

Bid Ref. 27-032 Well No 21 Rehabilitation

Closes 11/16/2026Opened 10/12/2026

City of Aurora, IL·Illinois

68% match

Well 115 Maintenance & Rehabilitation

Closes 11/18/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

68% match

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

City of Branson·Missouri

67% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Department of Water·Hawaii

67% match

IFB Job No. 27-03, Koloa Well F Pump Replacement, Kauai, Hawaii

Closes 11/12/2026Opened 10/19/2026

Massachusetts Dracut Water Supply District·Massachusetts

67% match

Well 4 Replacement Project

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

67% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

City of Riverside·California

67% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

Connecticut City of Meriden·Connecticut

67% match

Evansville Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

City of Meriden·Connecticut

67% match

RFP027-34 Platt & Lincoln Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

67% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

City of Meriden·Connecticut

67% match

RFP027-33 Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

People with Developmental Disabilities, NYS Office for·New York

67% match

SOIRA 7266 SR 3(Cranberry Lake) Replacement of Well Pump Project

Closes 11/4/2026Opened 10/7/2026

City of Hollywood·Florida

67% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

Massachusetts Town of Pembroke·Massachusetts

66% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

Bossier Parish Police Jury·Louisiana

66% match

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

City of Meriden·Connecticut

66% match

RFP027-35 Evansville East Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

New York City Department of Environmental Protection·New York

66% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

Gwinnett County Government·Georgia

66% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Key West·Florida

66% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Nevada Department of Human Services·Nevada

66% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

City of Rockford·Illinois

66% match

WELL 6 RESERVOIR REHAB

Closes 11/10/2026Opened 10/13/2026

City of Worcester·Massachusetts

66% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026