The solicitation calls for the complete removal of existing steam distribution lines and replacement with a new hot‑water system, including pumps, piping, controls, electrical power, structural supports, and site‑restoration work at the Albion Correctional Facility (Buildings 30‑32). The scope covers mechanical, electrical, structural, and erosion‑and‑sediment‑control disciplines, requiring coordination among multiple design consultants and adherence to New York State energy and building codes.
• Mechanical/HVAC: Remove steam‑to‑hot‑water equipment, install new hot‑water piping (1‑1½″ PHWS & 2″ PHWR), inline pumps, blending valves, and DDC controls.
• Electrical: Provide new 120 V circuits, motor controllers, DDC panels, and conduit runs for pump power and control.
• Structural: Design and fabricate steel framing, stanchion foundations, anchor bolts, and hot‑dip galvanized connections for overhead piping.
• Site/ESC: Perform demolition of existing fence, install temporary erosion‑control measures, and restore disturbed areas to original conditions.
• Compliance: All work must meet 2025 Energy Code, 2025 Uniform Code, and related AISC/ACI standards; consultants’ certificates of authorization must remain valid through project completion.