Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Rail Curves Package 3 for MOTCO, CA

U.S. Department Of Defense·California

Rail Curves Package 3 for MOTCO, CA

Closes 1/15/2026$5M – $10MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is seeking capability statements from contractors for a potential requirement to remove and replace existing railroad curves located at the Military Ocean Terminal Concord (MOTCO), Concord, CA. The scope of the project includes the repair of approximately 2,500LF rail by replacement, including repairs of ties, rails, turnouts, rail crossings, and other track material for multiple rail curves. The project is anticipated to be a firm-fixed-price contract with an estimated construction duration of 400 calendar days. The Government estimates the magnitude of construction for this project to be between $5,000,000 and $10,000,000. Some key points to consider: * The project includes the repair of approximately 2,500LF rail by replacement. * The scope of work includes repairs of ties, rails, turnouts, rail crossings, and other track material for multiple rail curves. * The project is anticipated to be a firm-fixed-price contract. * The estimated construction duration is 400 calendar days. * The Government estimates the magnitude of construction for this project to be between $5,000,000 and $10,000,000.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jessica Padilla(Contract Specialist)

[email protected]

(916) 557-6783

Key dates

Opened
12/15/2025
Closes
1/15/2026
Projected award
7/1/2026
Duration
400 calendar days

Last updated

Details

Type
Sole Source
Industry
Civil Engineering
NAICS
237990
Solicitation №
W9123826S0009

Budget estimate

$5,000,000 – $10,000,000

The estimated budget for this project is between $5,000,000 and $10,000,000. This estimate is based on the Government's estimate of the magnitude of construction for this project. The actual budget may vary depending on the complexity of the project, the number of contractors bidding, and other factors. The budget may be influenced by factors such as the cost of materials, labor, and equipment, as well as the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Southern California Regional Rail Authority·California

Top match · 66%

Track Concrete Fastening OTM

Closes 12/1/2026Opened 10/19/2026

California High‑Speed Rail Authority·California

65% match

HSR26-81 Request for Proposals for Repair and Construction Projects. Multiple Award Task Order (MATOC) On-Ramp

Closes 12/16/2026Opened 10/22/2026

California Department of Transportation·California

63% match

SB Minor B 03A4243 - Bicycle Railing Installation - Placer County

Closes 11/12/2026Opened 10/29/2026

California High-Speed Rail Authority·California

63% match

HSR25-29 Invitation for Bids for OCS Components

Closes 11/5/2026Opened 9/16/2026

California Department of General Services·California

63% match

Main Line Guardrail IFB

Closes 11/16/2026Opened 10/23/2026

California Department of Transportation·California

61% match

IFB Guardrail Services, Imperial and San Diego Counties.

Closes 11/3/2026Opened 10/19/2026

California Department of Transportation·California

61% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

City of Pasadena·California

61% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

California Department of Forestry and Fire Protection·California

61% match

Diesel Exhaust Removal System Installation Services

Closes 11/2/2026Opened 9/30/2026

City of Napa·California

61% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

California Department of Transportation·California

61% match

Cold plane, HMA, curb ramp, culvert, and modify electrical system.

Closes 11/18/2026Opened 10/12/2026

California Department of General Services·California

61% match

CONTRACT:26-337609; DSH ATASCADERO ELECTRICAL UPGRADES; DEPARTMENT OF STATE HOSPITALS; ATASCADERO, SAN LUIS OBISPO COUNTY, CALIFORNIA; PROJECT:142452A

Closes 11/18/2026Opened 10/9/2026

Southern California Regional Rail Authority·California

61% match

Systemwide Signage and Wayfinding Master Plan

Closes 12/2/2026Opened 10/29/2026

California Department of General Services·California

61% match

Land Survey Products

Closes 11/2/2026Opened 10/19/2026

Port of Stockton·California

61% match

Pre-Construction Services Long Lead Double Track (LLDT) Rail

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of The Interior·California

60% match

Northern California Area Office (NCAO) Low Bed Tra

Closes 11/16/2026Opened 10/28/2026