Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›USCG Station Bodega Bay Mess Deck and Comms Room Electrical

U.S. Department Of Homeland Security·California

USCG Station Bodega Bay Mess Deck and Comms Room Electrical

Closes 7/17/2026$15k – $25kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Coast Guard is seeking a contractor to correct hazardous electrical conditions and install new dedicated convenience outlet circuits at USCG Station Bodega Bay. The work includes furnishing all labor, materials, tools, equipment, supervision, and incidentals necessary to eliminate existing mis-wired conditions, resolve recurring breaker trips, and provide safe, code-compliant electrical service for mission-essential equipment. The contractor will be required to perform the following tasks: * Install a new, dedicated electrical pathway originating at the existing electrical panel to serve new convenience outlets and isolate affected loads * Furnish and install eight new 110V convenience receptacles, commercial-grade, grounded, tamper-resistant, where applicable * Eliminate shared circuits contributing to overload or nuisance tripping * Correct improper voltage conditions, including removal of any 240V feeds supplying 110V devices * Test all new circuits for correct voltage, polarity, grounding, and load * Demonstrate proper operation of all installed receptacles * Verify that previously tripping breakers operate normally under typical load conditions The project duration is 30 days, and the contractor must complete all work within this timeframe. * Key aspects of the project include: * Electrical system repairs * Installation of new convenience outlets * Elimination of hazardous electrical conditions * Compliance with National Electrical Code (NEC) and OSHA regulations * Coordination with the Unit Representative and compliance with all lockout/tagout procedures

Attached files

Contact

Anthony Ciurlino(Contracting Officer)

[email protected]

(808) 722-2126

Key dates

Opened
6/30/2026
Pre-bid meeting
7/6/2026
Site visit
7/6/2026
Closes
7/17/2026
Duration
30 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
30462PR260000045

Budget estimate

$15,000 – $25,000

Based on the information provided, the estimated budget for this project is less than $25,000. The US Coast Guard has specified that the estimated magnitude of this project is less than $25,000, and the contractor will be required to provide a firm-fixed price for the work. The budget will depend on the contractor's ability to complete the work within the specified timeframe and in accordance with the terms of the contract. Factors that may influence the budget include the complexity of the electrical work, the number of convenience outlets to be installed, and the need for any additional materials or labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·New York

Top match · 62%

Fire Alarm BPA Fort Drum NY

Closes 1/13/2027Opened 1/14/2022

U.S. Department Of Defense·New York

61% match

Cable TV, Wired and Wireless Internet for Fort Drum, NY

Closes 4/13/2028Opened 3/15/2023

U.S. Department Of Homeland Security·Florida

61% match

STA Sand Key Repair Fuel Lines and Tank

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·Alaska

61% match

(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities

Closes 11/16/2026Opened 10/26/2026

U.S. Department Of Homeland Security·Maryland

61% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

U.S. Department Of Defense·Virginia

61% match

CVN 75 RCOH Painting, Decking and Lagging

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of Homeland Security·Florida

61% match

DOCK-SIDE (DS): CGC RELIANCE DS FY27

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Homeland Security·Maryland

61% match

INDUSTRY DAY: WPC Work Platforms

Closes 12/26/2026Opened 12/18/2025

U.S. Department Of Defense·Ohio

61% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Homeland Security·Maryland

61% match

USCG Yard: Sensors and Meters

Closes 11/6/2026Opened 10/30/2026

U.S. Department Of Homeland Security·Maryland

61% match

HEAT WAGON

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Maine

61% match

59--JUNCTION BOX

Closes 11/19/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

61% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Homeland Security·Alabama

61% match

USCGC DOLPHIN FUEL TANK CLEANING

Closes 11/9/2026Opened 10/28/2026

U.S. Department Of Defense·Virginia

60% match

Civilian Mariner Wireless Network (CivMar WiN) Installation and Sustainment Follow-on Contract

Closes 11/2/2026Opened 10/6/2026

City of Clearwater·Florida

60% match

Northeast Advanced Pollution Control Facility Install Generator Docking Station at Sand Filter and Reclaim Buildings

Closes 12/16/2026Opened 10/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

60% match

Replace Electrical Panels – MacCormick Secure Center

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Homeland Security·North Carolina

60% match

Asset 22355 Engine Repair

Closes 11/6/2026Opened 10/29/2026

Department of Transportation·South Carolina

60% match

OPEN GRID DECK 22X60 D3 BRIDGE

Closes 11/12/2026Opened 9/29/2026

U.S. Department Of Defense·Pennsylvania

60% match

Amphibious/CVN Engineering and Ship Control Systems

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Homeland Security·Washington

60% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026

U.S. Department Of Defense·Pennsylvania

60% match

RM16-1405 BUILDING 592 RENOVATIONS

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Homeland Security·Alaska

60% match

Dry-dock: USCGC JOHN MCCORMICK DD FY27

Closes 11/12/2026Opened 10/26/2026