The University of California, Los Angeles (UCLA) Capital Programs issued a sealed‑bid procurement to replace RF/XR equipment in the RRUMC Room 1508F. Three contractors submitted bids, with MIK Construction, Inc. awarded the contract at a base amount of $1,538,888. The work encompasses demolition, structural finishes, mechanical/electrical/plumbing (MEP) upgrades, fire safety systems, interior finishes, millwork, cabinetry, and specialty nurse‑call and signage systems. A wide roster of California‑based subcontractors will perform trades such as demolition, doors, drywall, electrical, fire alarm, fire sprinklers, HVAC, flooring, painting, plumbing, tile, and millwork. The total bid values range from approximately $1.59 M to $2.27 M, indicating a mid‑size capital‑equipment replacement project.
• Scope includes full interior renovation and equipment replacement for a radiology research suite.
• Multiple trades coordinated by a prime contractor (MIK Construction) with numerous specialized subcontractors.
• Awarded contract value roughly $1.54 M (base) to $2.25 M (alternative bids).