Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Transmission Main from Water Treatment Plant to Loop 363…

Awarded contract·City of Temple·Texas

Transmission Main from Water Treatment Plant to Loop 363 Phase I

Won by H&B Contractors, Inc +9 more$900kMultiple Award
Contract source

Awarded vendors

  • H&B Contractors, Inc
  • Skyblue Utilities, Inc
  • JKB Construction Company LLC
  • TTG Utilities, LP
  • Wolff Construction, LP
  • Pipe Works Constructors, LLC
  • B-Corp Utilities, Inc
  • Bell Contractors, Inc
  • Nelson Lewis, Inc
  • Whitestone Civil Construction, LLC

Description

The contract is for the construction of a transmission main from the water treatment plant to Loop 363 Phase I, with approximately 4,000 ft of 24" water line, associated valves, and appurtenances. The bid was awarded to one of the ten bidders, with the lowest bid being $675,901.43 by B-Corp Utilities, Inc. The contract requires a bid bond, bond requirement affidavit, and credit check authorization. The project includes a pre-bid conference and a voluntary pre-bid conference was held on July 23, 2015. • The contract is for a construction project • The project includes approximately 4,000 ft of 24" water line • The bid was awarded to one of the ten bidders • The lowest bid was $675,901.43 by B-Corp Utilities, Inc • The contract requires a bid bond, bond requirement affidavit, and credit check authorization

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Industry
Construction
NAICS
237110
Solicitation №
52-07-15

Contract value

$900,000

The contract value can be estimated based on the bids received, with the lowest bid being $675,901.43 by B-Corp Utilities, Inc, and the highest bid being $1,016,186.45 by H&B Contractors, Inc. Considering the bids, the contract value is likely to be around $800,000 to $1,000,000. Factors that may influence the contract value include the cost of materials, labor, and equipment, as well as any changes or modifications to the project scope.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Public Water Supply District No. 2 of St. Charles County·Missouri

Top match · 72%

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Columbus Ohio·Ohio

69% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

City of Bellevue·Washington

69% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Town of Eatonville·Florida

68% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

NYS Greenburgh, Town of·New York

68% match

Lead Service Lines Identification Project - Phase I

Closes 12/1/2026Opened 10/28/2026

Massachusetts Town of Westborough·Massachusetts

68% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Fort Bend County Municipal Utility District No. 134A·Texas

68% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Contra Costa Water District·California

67% match

City of Brentwood Water Treatment Plan Actuator and Control System Upgrades

Closes 11/5/2026Opened 10/1/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Long Prairie·Minnesota

67% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Fresno·California

67% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

Bristol Virginia Utilities Authority·Virginia

66% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of Riverside·California

66% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

The Metropolitan Water District of Southern California·California

66% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

Upper Occoquan Service Authority·Virginia

66% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Maryland Mayor and Town Council of Oakland·Maryland

66% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

City of Kyle·Texas

66% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

Catawba Regional Council of Governments·South Carolina

66% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Charlotte·North Carolina

66% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Waukegan·Illinois

66% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

City of Grand Pass·Oregon

66% match

Water Treatment Plant Solids Hauling FY24-26

Closes 12/31/2026Opened 3/1/2023