The Citadel is seeking to replace the freezer and cooler box in Coward Hall. The contract was awarded to Alexander Equipment Company for $161,334.00 after negotiations. The original bid was $163,587.00, but the company overlooked a change in the specifications and was given the chance to modify their bid. The work must be completed during the time that the Corps of Cadets are not on campus. The scope of work includes the demolition, fabrication, installation, and replacement of the refrigeration box system. Key points to consider:
• The contract was awarded after negotiations due to the initial bid being unsuccessful.
• The work must be completed during a specific time frame.
• The scope of work includes demolition, fabrication, installation, and replacement of the refrigeration box system.
• The contract value is $161,334.00.
• The vendor is Alexander Equipment Company.