The Sacramento International Airport General Aviation Terminal Ramp Project involves the construction of a blast wall and taxiway improvements at the Sacramento International Airport. The estimated construction cost is $480,000.00, and the required contractor's California license class is Class A, General Engineering. The project includes a non-mandatory pre-bid conference and walk-through. The contract was awarded to North Star Construction and Engineering Inc. with a bid of $574,028.00.
• The project is located at the Sacramento International Airport General Aviation Terminal Area.
• The work includes the furnishing of all labor, materials, equipment, transportation, and services necessary for the construction of the blast wall and taxiway improvements.
• The estimated construction cost is $480,000.00.
• The required contractor's California license class is Class A, General Engineering.
• A non-mandatory pre-bid conference and walk-through were held for the purpose of reviewing the project.