The City of Independence, Missouri, is seeking a qualified plumbing firm to provide Water Service Line Repair services. The contract includes various items such as mobilization cost, copper service line installation, repair costs, and labor costs. The contract recommends Calinton Plumbing, LLC as the low bid. The key points of this contract include:
* The contract is for water service line repair services
* The contract includes various items such as mobilization cost, copper service line installation, repair costs, and labor costs
* The contract recommends Calinton Plumbing, LLC as the low bid
* The contract has a total price of $118,414.50 for Calinton Plumbing, LLC and $122,480.50 for SHEDIGS IT LLC
Some of the key items and their prices are:
* Mobilization cost: $450.00
* 3/4" copper service line installation: $27.20 per foot
* 1" copper service line installation: $31.20 per foot
* Repair cost for ¾" & 1" svc line under pavement: $296.00 per each
* Labor costs: vary depending on the type of labor and the time of day