The City of Port St. Lucie has awarded a contract to TLC Engineering Solutions Inc. for professional design services for a new diesel generator at the Prineville Lime Water Treatment Facility. The contract includes the design and development of 100% construction plans for a permanent diesel generator with a capacity of 1,000 kW. The scope of work also includes modification of the existing generator concrete slab, upgrade of conduit and wire, sheet metal work, replacement of stainless-steel thimble through roof, and other related tasks. The contract has a duration of one year, starting from August 28, 2024, and ending on August 27, 2025. The total amount to be paid by the City to the Consultant is $166,650.
• The contract includes a detailed scope of work, including design and development of construction plans, modification of existing infrastructure, and replacement of equipment.
• The Consultant is required to provide professional engineering and design services, including electrical, mechanical, and structural engineering.
• The contract includes provisions for payment, including a total amount to be paid and a payment schedule.
• The contract also includes provisions for insurance, including workers' compensation, commercial general liability, and professional liability insurance.
• The Consultant is required to comply with all applicable laws, ordinances, and codes, and to obtain all necessary permits and approvals.