The Cowlitz Falls Hydroelectric Project Top Deck Railing Replacement contract involves the replacement of the top deck railing at the Cowlitz Falls Hydroelectric Project. The contract includes several items, such as district requested mobilization and de-mobilization, demolition and off-site disposal of existing railing, temporary OSHA compliant guardrail, concrete surface repair areas, standard and removable railing installation, and integrated vehicle barrier and railing installation. The contract has a total value of $232,610.00 to $323,179.24, depending on the vendor. The contract was awarded through an Invitation for Bid (IFB) process, and several vendors submitted bids. The contract documents and bid tabulation are available for download.
• The contract involves replacement of the top deck railing at the Cowlitz Falls Hydroelectric Project
• The contract includes several items, such as district requested mobilization and de-mobilization, demolition and off-site disposal of existing railing, and more
• The contract has a total value of $232,610.00 to $323,179.24, depending on the vendor
• The contract was awarded through an Invitation for Bid (IFB) process
• Several vendors submitted bids, including Advanced Excavating Specialists (AES), Artus Construction, and more