The Big Horn On-Site Well (W-126) Pump Installation Project involves the installation of a 1500 gallon per minute deep well vertical turbine pump and above ground motor for an existing groundwater well on the Big Horn Groundwater Treatment Plant. The project is located at 8280 Civic Center Drive, Elk Grove, CA 95757. The estimated construction cost is $70,000. The contract was awarded to one of the four vendors that submitted bids, but the text does not specify which one. Key aspects of the project include:
• Installation of a deep well vertical turbine pump and above ground motor
• Location at the Big Horn Groundwater Treatment Plant
• Estimated construction cost of $70,000
• Four vendors submitted bids for the project