Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Mexico
  4. ›Construction
  5. ›Agua Fria Wastewater Project – Phase III

Awarded contract·Santa Fe County·New Mexico

Agua Fria Wastewater Project – Phase III

Won by Apple Mountain Constructors$4MAwarded 7/7/2026Single Award
Contract source

Awarded vendors

  • Apple Mountain Constructors

Description

The Agua Fria Wastewater Project – Phase III is a municipal‑scale sewer‑infrastructure construction effort located in the historic Village of Agua Fria, Santa Fe County, NM. The contract calls for installation of new gravity‑fed 8‑inch sanitary sewers, low‑pressure 2‑inch HDPE force mains, associated manholes (including epoxy‑coated existing units), service‑line stub‑outs, flushing stations, and extensive roadway restoration (asphalt removal, back‑fill, curb & gutter, and resurfacing) across ten streets. The scope is broken down into detailed line‑item quantities for each street segment, with allowances for material testing, utility relocation, water‑line repair, and vibration monitoring. The procurement was conducted as a sealed competitive bid (full and open competition), with a bid deadline of June 2 2026 and a bid opening on June 16 2026. Apple Mountain Constructors was identified as the lowest responsive bidder and was notified of award on July 7 2026. The contract specifies a performance period of 350 calendar days from Notice‑to‑Proceed. • New‑construction of 8‑in. gravity sewers and 2‑in. low‑pressure HDPE mains. • Manhole construction, epoxy coating, and flushing‑station installation. • Full roadway rehabilitation (gravel, subgrade, base, prime coat, asphalt, curb & gutter). • Allowances for testing, utility relocation, water‑line repair, and vibration monitoring.

Attached files

Key dates

Questions due
5/12/2026
Pre-bid meeting
5/7/2026
Site visit
5/7/2026
Bids closed
6/2/2026
Intent to award
7/7/2026
Awarded
7/7/2026
Contract modified
6/2/2026
Duration
350 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
IFB 2026-0231-PW/DK

Contract value

$4,000,000

The abstract sheet lists several base‑bid totals ranging from roughly $3.1 M to $5.4 M. The awarded vendor’s bid was not disclosed, but the presence of four addenda and the extensive scope (≈ 10 k linear feet of sewer, 10+ new manholes, and > 10 k sq yd of roadway work) suggest a mid‑single‑digit‑million dollar contract. A reasonable midpoint estimate is about $4 million, plus the explicit allowances ($150 k total) which are already reflected in the bid totals. Therefore a ball‑park contract value of $4,000,000 is a defensible estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Bakersfield·California

Top match · 66%

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

El Paso Water·Texas

66% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Eastern Municipal Water District·California

66% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

El Paso Water·Texas

65% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

El Paso Water·Texas

65% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Bismarck·North Dakota

65% match

Wastewater Treatment Plant Polymer IFB

Closes 11/3/2026Opened 8/11/2026

Health, NYS Dept. of·New York

65% match

Drinking Water Fluoridation – Rolling Submissions - Component A: Planning and Feasibility Projects (DOH01-DWFAR-2023) - Component B: Implementation and Maintenance Projects - (DOH01-DWFBR-2023)

Closes 9/28/2028Opened 12/21/2022

Fort Bend County Municipal Utility District No. 219C·Texas

65% match

Wastewater Treatment Plant No. 1 -Phase 1 (0.15 MGD) Lease to serve Fort Bend County Municipal Utility District No. 219C

Closes 11/5/2026Opened 10/16/2026

Washington Suburban Sanitary Commission, MD·Maryland

65% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

Navajo Tribal Utility Authority·Arizona

65% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/21/2026

Erie County·New York

64% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

Loudoun Water·Virginia

64% match

BRWRF Phase lll - Package ll

Closes 1/14/2027Opened 9/14/2026

City of Palm Springs·California

64% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/10/2026Opened 10/13/2026

El Paso Water·Texas

64% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 12/2/2026Opened 9/20/2026

U.S. Department Of Defense·United States of America

64% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

Atlantic County Utilities Authority, NJ·New Jersey

64% match

Develop Solid Waste Conversion Facility at the Atlantic County Utilities Authority

Closes 12/9/2026Opened 10/13/2026

Navajo Tribal Utility Authority·Arizona

64% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/28/2026

Washington Suburban Sanitary Commission·Maryland

64% match

Potomac WFP Water Quality/PFAS Pilot Project REBID

Closes 12/1/2026Opened 10/14/2026

San Antonio Water System·Texas

64% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

Florida Governmental Utility Authority·Florida

64% match

Rio Vista Septic to Sewer

Closes 11/24/2026Opened 10/26/2026

City of Hollywood·Florida

64% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

County of San Luis Obispo·California

64% match

Nacimiento Water Project Unit G Repair Construction Management

Closes 11/3/2026Opened 9/29/2026

City of Hollywood·Florida

64% match

Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)

Closes 11/18/2026Opened 9/9/2026

California Grants·California

64% match

Proposition 68 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

U.S. Bureau of Reclamation·United States of America

63% match

WaterSMART: Desalination Construction Projects

Closes 8/26/2027Opened 5/14/2026