The Agua Fria Wastewater Project – Phase III is a municipal‑scale sewer‑infrastructure construction effort located in the historic Village of Agua Fria, Santa Fe County, NM. The contract calls for installation of new gravity‑fed 8‑inch sanitary sewers, low‑pressure 2‑inch HDPE force mains, associated manholes (including epoxy‑coated existing units), service‑line stub‑outs, flushing stations, and extensive roadway restoration (asphalt removal, back‑fill, curb & gutter, and resurfacing) across ten streets. The scope is broken down into detailed line‑item quantities for each street segment, with allowances for material testing, utility relocation, water‑line repair, and vibration monitoring. The procurement was conducted as a sealed competitive bid (full and open competition), with a bid deadline of June 2 2026 and a bid opening on June 16 2026. Apple Mountain Constructors was identified as the lowest responsive bidder and was notified of award on July 7 2026. The contract specifies a performance period of 350 calendar days from Notice‑to‑Proceed.
• New‑construction of 8‑in. gravity sewers and 2‑in. low‑pressure HDPE mains.
• Manhole construction, epoxy coating, and flushing‑station installation.
• Full roadway rehabilitation (gravel, subgrade, base, prime coat, asphalt, curb & gutter).
• Allowances for testing, utility relocation, water‑line repair, and vibration monitoring.