This municipal contract involves the removal of existing rail infrastructure and associated improvements along South 2nd Avenue in Yakima, Washington. The scope likely includes demolition, disposal of rail materials, site grading, utility coordination, and preparation for subsequent roadway or pedestrian upgrades. The project is managed by the City of Yakima and was competitively bid, with the award results summarized in a bid tabulation document.
• Scope: Rail removal, site remediation, and infrastructure upgrades on a city street corridor.
• Procurement: Competitive municipal bidding (details of vendors not disclosed in the excerpt).
• Potential work categories: Heavy civil construction, demolition, and site work.
Attached files
The award documents live at the source — open the contract source above to download them.