The Summit County Executive's Physical Plant Department is soliciting bids for a roof top HVAC unit replacement project at the Men's and Women's Community Based Correctional Facilities (CBCF) located in Akron, Ohio. The project involves replacing 28 roof top units at the two facilities. The engineer's estimated cost of the project is $258,000.00. The contract was awarded to SA Comunale Co. Inc, with a total price of $257,900.00.
• The project includes the installation of HVAC units as shown on the drawings and specifications.
• The contract requires the vendor to provide a bid bond and a signed Successful Bidder Requirements Form.
• The vendor must also upload a copy of the signed Successful Bidder Requirements Form in the General Attachments.
• The contract has a mandatory pre-bid meeting, which was held on March 28, 2019, at the Women's CBCF.