The City of Spokane is procuring a qualified consultant to develop a 30 % preliminary engineering study for implementing a water‑fluoridation system across its eight well stations. The consultant will assess existing conditions, design dosing and control systems, evaluate regulatory and environmental impacts, create cost estimates, perform life‑cycle cost analysis, and produce an outreach plan for the public.
• Conduct comprehensive existing‑conditions assessments (structural, mechanical, electrical, hydraulic, SCADA, water‑quality) for each well station.
• Develop 30 % design deliverables including system layout, equipment specifications, integration with existing infrastructure, and cost/benefit analyses.
• Provide O&M recommendations, non‑fluoridated filling‑station designs, and a public‑education outreach strategy.