The contract is for the 2020-21 Water System Rehabilitation project, which involves replacing pressurized water mains with ductile iron pipe, services, hydrants, and other associated work. The project is divided into two schedules, A and B, with different work scopes and locations. The contract was awarded through a competitive bidding process, and the bid opening was held on May 21, 2020. The engineering estimates for the project are $900,000 for Schedule A and $400,000 for Schedule B. The contract documents include plans, specifications, and bid items, which are available for download.
• The project involves replacing 6-inch, 10-inch, and 12-inch pressurized water mains with 8-inch and 12-inch ductile iron pipe.
• The project includes services, hydrants, removal and replacement of driveways, sidewalks, curb, and gutter.
• The project is divided into two schedules, A and B, with different work scopes and locations.
• The contract was awarded through a competitive bidding process.
• The bid opening was held on May 21, 2020.
• The engineering estimates for the project are $900,000 for Schedule A and $400,000 for Schedule B.