This contract establishes an “as‑needed” hydro‑excavation services arrangement for the City of Greeley, Colorado. The agreement provides a menu of unit‑priced tasks—hydro‑excavation truck crews, mill‑tailing transport, various traffic‑control services, fill material supply, surface patching, hot‑bituminous pavement patching, and curb/gutter/sidewalk removal and replacement—each billed per hour, per day, per square foot, or per item. Mobilization is charged at a discounted $250 per hour for a three‑person crew, with a $180 per‑person per‑diem for overnight work and a $1,500 minimum call‑out for certain tasks. The solicitation was opened on June 10 2026 at 2 PM, with Dolly Daniels listed as the buyer. Four firms submitted bids; the award appears to have been made to Apeiron Utility Construction LLC, which offered the lowest rates on most line items. No total contract ceiling, performance period, or renewal terms are disclosed.
• Scope covers hydro‑excavation, mill‑tailing haul‑away, traffic‑control permits, shoulder work, flagging, backfill material, surface patching, hot‑bitumen patching, and curb/gutter/sidewalk replacement.
• Pricing is presented as unit rates (per hour, per day, per square foot, etc.) plus mobilization, per‑diem, and minimum call‑out fees.
• The award is presumed to be to Apeiron Utility Construction LLC, a Colorado‑based contractor, under an “as‑needed” (likely IDIQ) framework.