The contract is for xeriscaping the WSU BRT Corridor as designed by G Brown Design. The successful bidder must provide a 100% payment bond and a 100% performance bond before the start of work may begin. The contract is for a one-time purchase, but WSU reserves the right to purchase additional products based upon this bid for up to 120 days after the initial purchase. Key points to consider include:
• The contract was awarded to Terra Works Inc. for $443,599.00
• The project involves xeriscaping the WSU BRT Corridor
• A 100% payment bond and a 100% performance bond are required
• A five percent bid bond is required of all bidders
• The contract is for a one-time purchase with the option for additional purchases within 120 days