The Arroyo Grande Creek Channel Emergency Capacity Restoration Phase 1 Project aims to restore the channel design capacity and permanently repair damaged sections of the levee prior to the next rainy season. The project involves removing up to 25,000 cubic yards of accumulated sediment and storm-deposited debris. The contract was awarded to Raminha Construction, Inc. for a total bid amount of $1,661,727. The project includes various tasks such as progress scheduling, mobilization, construction surveying, traffic control, and channel excavation. The key features of this contract include:
• Emergency capacity restoration of the Arroyo Grande Creek Channel
• Removal of accumulated sediment and debris
• Repair of damaged sections of the levee
• Construction surveying and traffic control
• Channel excavation and restoration hydroseeding
This contract is relevant to companies specializing in construction, engineering, and environmental services.