The contract is for the replacement of the existing domestic hot water heater and supporting control valves at Lyndon B. Johnson Hospital for Harris Health System. The project consists of the replacement of the existing hot water heater system, which is past its life expectancy and experiencing moderate scaling. The estimated total construction cost is $464,282.00, with a construction bid of $422,072.00 and an owner’s contingency of $42,210.00. The contractor for the project is TD Industries.
• The project is for the replacement of the existing domestic hot water heater and supporting control valves.
• The existing hot water heater system is past its life expectancy and experiencing moderate scaling.
• The estimated total construction cost is $464,282.00.
• The construction bid is $422,072.00.
• The owner’s contingency is $42,210.00.
• The contractor for the project is TD Industries.