Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›TMT WAREHOUSE #1 WEST LOADING DOCK COATING/PAINTING

Awarded contract·Jacksonville Port Authority·Florida

TMT WAREHOUSE #1 WEST LOADING DOCK COATING/PAINTING

$250kSingle Award
Contract source

Description

This JAXPORT contract calls for the complete removal of rust and old paint, corrosion repair, and the application of a protective coating system to all structural steel components (I‑beams, joists, purlins, columns, fire‑suppression piping, concrete bases, and bollards) beneath the west loading dock of TMT Warehouse #1 at the Talleyrand Marine Terminal. Work includes pressure‑washing, surface preparation to SSPC‑SP2/3 standards, priming, top‑coating (Carboline or approved equivalent), third‑party thickness verification, and full documentation (submittals, safety plans, as‑built drawings, O&M manuals). The project is funded by JAXPORT and the Florida Department of Transportation and must be completed within a tight 45‑day schedule after the Notice to Proceed. All personnel must hold TWIC credentials, complete maritime security training, and be covered by the agency‑specified insurance and bonding requirements. The solicitation was open to competitive bidding, with a bid deadline of 2 PM ET on 24 Feb 2025, and the contract was subsequently awarded (vendor name undisclosed).

Attached files

Key dates

Questions due
2/11/2025
Pre-bid meeting
2/7/2025
Site visit
2/7/2025
Bids closed
2/24/2025
Contract modified
7/11/2025
Duration
45 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Invitation for Bid
Industry
Construction
NAICS
238350
Solicitation №
ITB_MC-1931D

Contract value

$250,000

The documents do not state a contract dollar amount. Estimating based on typical industrial coating rates (approximately $8–$12 per square foot of steel surface, including prep, priming, and top‑coat) and assuming the dock area involves roughly 15,000 ft² of steel exposure, the material and labor cost would be in the range of $120,000–$180,000. Adding required bonding, insurance, overhead, and a modest contractor profit margin (≈30 %) brings the total contract value to roughly $250,000 ± $50,000. Therefore a reasonable ballpark estimate is about $250 k.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Key Colony Beach·Florida

Top match · 68%

ITB 2026-03 WWTP Tanks Painting

Closes 11/2/2026Opened 9/25/2026

U.S. Department Of Agriculture·Alaska

68% match

Misty Barge Dry Dock Services

Closes 11/6/2026Opened 10/19/2026

Greater Dayton Regional Transit Authority·Ohio

66% match

Maintenance Facility Painting Project

Closes 12/1/2026Opened 10/16/2026

City of Orange City·Florida

66% match

MAIN WATER TREATMENT PLANT GROUND STORAGE TANK PAINTING

Closes 12/3/2026Opened 10/25/2026

City of Hartford·Connecticut

65% match

Painting Services for the Hartford Public Schools

Closes 11/5/2026Opened 10/15/2026

City of Hartford·Connecticut

65% match

Painting Services for the Hartford Public Schools

Closes 11/17/2026Opened 10/26/2026

Jacksonville Port Authority·Florida

65% match

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026

City of Cleveland·Ohio

65% match

542 - Windbreak Screen for Loading Dock

Closes 11/5/2026Opened 10/30/2025

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

64% match

Building Repairs and Maintenance - Central Warehouse

Closes 11/5/2026Opened 10/27/2026

Fontana Unified School District·California

64% match

Interior & Exterior Painting - Maintenance

Closes 11/2/2026Opened 10/3/2026

KC Board of Public Utilities·Kansas

64% match

On-Call Industrial Painting Services

Closes 11/18/2026Opened 10/28/2026

City of Norfolk·Virginia

63% match

Citywide Painting Services

Closes 11/3/2026Opened 10/6/2026

Iowa Department of Transportation·Iowa

63% match

Construction of Concrete Loading Dock at DOT Ames South Lot.

Closes 11/10/2026Opened 10/19/2026

City of Key West·Florida

63% match

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

U.S. Department Of Homeland Security·Florida

62% match

DOCK-SIDE (DS): CGC RELIANCE DS FY27

Closes 11/6/2026Opened 10/22/2026

City of Fort Myers·Florida

62% match

Traffic Signal Painting

Closes 11/6/2026Opened 10/7/2026

Massachusetts Watertown Housing Authority·Massachusetts

62% match

FISH 321113

Closes 11/12/2026Opened 10/20/2026

Port of Lake Charles·Louisiana

62% match

Industrial Park East Rail Extension & Trans‑Loading Yard

Closes 11/19/2026Opened 10/13/2026

Buy Board Purchasing Cooperative·Texas

62% match

Trade Services (Painting)

Closes 11/12/2026Opened 9/25/2026

Virginia Department of Transportation·Virginia

62% match

IFB 161245 - Sunnybank Ferry Dry Dock; Nthn Neck

Closes 11/4/2026Opened 10/9/2026

City of Salina·Kansas

62% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/11/2026

City of Salina·Kansas

62% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/20/2026

City of Salina·Kansas

62% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Hollywood·Florida

62% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of Homeland Security·Washington

62% match

Dry-Dock: USCG ANT PUGET SOUND (55107) FY27 DD

Closes 11/5/2026Opened 9/25/2026