The contract is for the reconstruction of water mains and street reconstruction on 4th Ave SW. The work includes the replacement of existing facilities as specified in the contract. The contract was awarded to A-1 Excavating, Elcor, and SL Contracting, with firm fixed total prices of $1,295,669.00, $1,137,490.28, and $1,329,491.10, respectively. The scope of work includes the reconstruction of water mains and street reconstruction, and the contract requires compliance with various regulations and specifications.
• The contract requires the reconstruction of water mains and street reconstruction on 4th Ave SW.
• The work includes the replacement of existing facilities as specified in the contract.
• The contract was awarded to A-1 Excavating, Elcor, and SL Contracting.
• The firm fixed total prices for the contract are $1,295,669.00, $1,137,490.28, and $1,329,491.10, respectively.
• The contract requires compliance with various regulations and specifications, including prevailing wage requirements and targeted business workforce compliance.