The City of Bellevue is seeking bids for the AC Water Main Replacement 2017 Phase 1 project. The project involves constructing approximately 6,423 LF of ductile iron water mains, installing new fire hydrant assemblies, water services, and relocating existing utilities. The engineer's estimate for the project is $2,073,189.00. The contract was awarded to Kar-Vel Construction with a bid price of $2,070,498.00.
• The project includes constructing water mains and installing fire hydrant assemblies and water services.
• The project requires relocating existing utilities and restoring surface conditions.
• The contract was awarded to Kar-Vel Construction with a bid price of $2,070,498.00.
• The project manager is Abe Santos.
• The bid contact is Tom Carroll.