The contract is for the addition of mechanical cooling to the Highland Community Center Gym using a DX coil and air-cooled condensing unit. The project has an engineer's estimate of $60,000, but the actual bid prices ranged from $80,137.73 to $121,243.00. The contract was awarded to Duotec, who had the lowest bid price. The scope of work includes the installation of a new air conditioning system, and the project is expected to be completed within a certain timeframe, although the exact duration is not specified. Key features of the project include the use of a DX coil and air-cooled condensing unit, and the requirement for the contractor to complete the work in accordance with the project manual and specifications.
• The project involves the addition of mechanical cooling to the Highland Community Center Gym.
• The engineer's estimate for the project is $60,000.
• The actual bid prices ranged from $80,137.73 to $121,243.00.
• The contract was awarded to Duotec, who had the lowest bid price.
• The scope of work includes the installation of a new air conditioning system.